U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

US Finishing/Cone Mills

File Name Description Category Uploaded Size Download 
USFCM Public Meeting 10_11_2011 v2 2.pptx Presentation for TCRA 10/11/2011 USFCM Public Meeting TCRA 10/10/2011 11650 KB Download
Cone Mills RI-Removal-final-10-4-11.pdf 10/11/2011 Public Meeting Fact Sheet: Integrated Remedial Investigation and Time Critical Removal Action Fact Sheet 10/6/2011 992 KB Download
USFCM Signed Action Memo 9-2011.pdf Action Memo for Time Crtical Removal Action Action Memo 9/14/2011 18061 KB Download
USFCM State Transmitted Memo and AM 9_2011.pdf USFCM State Transmitted Action Memo Action Memo 9/23/2011 733 KB Download
USFCM ARARs Letter 9-30-2011.pdf ARARs Letter 9/30/2011 TCRA 10/6/2011 53 KB Download
DMP_Rev 0_US FinishingrwhAM.pdf Draft Data Management Plan TCRA 10/7/2011 271 KB Download
USFCM_PAMP_R1_final.pdf USFCM Perimeter Air Monitoring Plan TCRA 10/10/2011 2997 KB Download
us finishing ej map.jpg Map of Potential Environmental Justice Areas TCRA 6/9/2011 186 KB Download
AFP EPA Revised Access Ag0001.pdf Access Agreement RSI/ER 8/11/2011 94 KB Download
US Finishing Cone Mills Waste Profiles.pdf Waste Profiles for ER containers RSI/ER 9/9/2011 1278 KB Download
US Finishing Manifest.pdf Waste Manifests from 9/22/2011
RSI/ER 10/11/2011 879 KB Download
USFCM_RSI_ER_LetterReport_FINAL.pdf Removal Site Investigation and Emergency Response Letter Report, August 2011 RSI/ER 9/19/2011 10482 KB Download
2007_01 Duke PCB Assessment.pdf PCB Assessment conducted by Duke Energy in 2007. RSE 8/5/2011 19233 KB Download
Asbestos Inspection Report Rev.1.pdf Asbestos Inspection Report July 2010 prepared by AECOM for SCDHEC RSE 6/9/2011 9539 KB Download
2007_09 Duke PCB Removal.pdf PCB Removal conducted by Duke Energy in 2007. RSE 8/5/2011 11578 KB Download
Cone Mills RI conducted by Synterra 2006 Full Report.pdf Remedial Investigation conducted by Synterra for American Fast Print in accordance with a work plan approved by SCDHEC dated 2006 RSE 6/9/2011 59382 KB Download
ESI Report.pdf Expanded Site Investigation - November 2006 RSE 5/20/2011 173299 KB Download
2005_02 Fletcher Group Removal Update Report.pdf Removal conducted by Fletcher Group on behalf of PRP in 2005. RSE 8/5/2011 9083 KB Download
ESI report-text only.pdf ESI Report (text only) RSE 5/20/2011 5331 KB Download
1991_07 RIFS GeoTran.pdf RI/FS conducted by Geotrans at the site in 1991. RSE 8/5/2011 20891 KB Download
HRS Documentation package.pdf HRS package HRS 5/20/2011 2979 KB Download
RI Kickoff-10-11-11.pptx Remedial Investigation Public Meeting Presentation October 11, 2011 Remedial Program 10/18/2011 4402 KB Download
SESD QAPP 1-20-12.pdf January 2012 Field Sampling Event SESD QAPP QAPP 1/20/2012 12623 KB Download
Final rpt waste gen rpt.pdf ERRS Final Removal Report 2012. Summarizes the actions taken during the 2012 removal action. Includes waste volumes and waste disposal information. Report 3/1/2016 4000 KB Download