Durant Metal Shredding Fire

All POL/SITREP's for this site Durant Metal Shredding Fire
Durant, OK - EPA Region VI
POLREP #6
Printer Friendly  |   PDF
 
U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Durant Metal Shredding Fire - Removal Polrep
Final Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region VI

Subject: POLREP #6
Durant Metal Shredding Fire
A6CC
Durant, OK
Latitude: 33.9831545 Longitude: -96.3555473


To:
From: Nicolas Brescia, OSC
Date: 9/26/2011
Reporting Period:

1. Introduction
  1.1 Background
   
Site Number:      Contract Number:  
D.O. Number:      Action Memo Date:  
Response Authority: CERCLA    Response Type: Emergency
Response Lead: PRP    Incident Category: Removal Assessment
NPL Status: Non NPL    Operable Unit:
Mobilization Date: 9/6/2011    Start Date: 9/6/2011
Demob Date:      Completion Date:  
CERCLIS ID:    RCRIS ID:
ERNS No.:    State Notification: 09/06/2011
FPN#:    Reimbursable Account #:


1.1.1 Incident Category

1.1.2 Site Description
Durant Metal Shredding (DMS), LLC is a recycling company in Durant, Oklahoma. DMS specializes in crushing and shredding car parts.

1.1.2.1 Location
DMS is located 2.5 miles South East of Durant, Oklahoma.

1.1.2.2 Description of Threat
A large pile of shredded automobile fluff caught on fire from a lightning strike and burned creating a large plume of smoke. The size of the piles on fire was determined to be 40 feet tall, 50 yards wide and 120 yards long.The plume was migrating over and near several residential areas. Multiple residents reported inhalation issues from the fire.

1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
OSC Brescia and OSC Todd responded to the site and met with the Durant Fire Chief, ODEQ, the Responsible Party and the Durant Emergency Manager. Upon initial assessment, no air monitoring was being conducted by the RP. OSC Brescia instructed START to begin air monitoring outside of the facility following the plume, along the perimeter to determine VOC and particulate concentrations. START began air monitoring downwind of the facility to determine if any public health threat existed. OSC Brescia and ODEQ requested that the RP begin air monitoring on site and off site for VOCs and particulates. The RP contracted an environmental contractor to extinguish the fire and to provide air monitoring support. EPA and ODEQ requested the RP to create a air monitoring/sampling plan for the duration of the incident. Upon the assessment of the pile, it was determined that a small percentage of the auto fluff could contain brake pads with asbestos. OSC Brescia instructed START to obtain asbestos sampling capability for three locations in the area. Upon request of Durant Emergency Management, OSC Brescia instructed START to also conduct three vacuum asbestos samples at three residences downwind of the plume.


2. Current Activities
  2.1 Operations Section
    2.1.1 Narrative

2.1.2 Response Actions to Date
At 1230 on September 12, 2011, OSC Brescia met with the RP, Emergency Management officials and ODEQ to conduct a final site walk. The RP informed the agencies that the fire had been extinguished the previous day and that the piles of debris had been completely segregated. A small amount of firewater remained at the site. Once OSC Brescia walked the site, he determined that no further action was necessary by the RP. The ODEQ will supervise any soil excavation and waste disposal generated from the incident.
 
OSC Brescia reviewed the residential asbestos sample results with the Environmental Response Team and determined that no significant count was documented in any of the three homes sampled. The analytical from the sampling event confirmed that no asbestos hazard existed from the fire event.

2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)


2.1.4 Progress Metrics
  


Waste Stream Medium Quantity Manifest # Treatment Disposal
           
           
           



  2.2 Planning Section
   

2.2.1 Anticipated Activities
No further actions are necessary.

2.2.1.1 Planned Response Activities
No further actions are necessary.

2.2.1.2 Next Steps
None.


2.2.2 Issues


  2.3 Logistics Section
    No information available at this time.

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    No information available at this time.

3. Participating Entities
  No information available at this time.

4. Personnel On Site
  No information available at this time.

5. Definition of Terms
  No information available at this time.

6. Additional sources of information
  No information available at this time.

7. Situational Reference Materials
  No information available at this time.