U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Shushan Bentwood II - Removal Polrep
Final Removal Polrep

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region II
|
|
Subject:
|
POLREP #5
Final
Shushan Bentwood II
A22N
Shushan, NY
Latitude: 43.0919090 Longitude: -73.3443180
|
|
To:
|
Andrew Raddant, Department of Interior
Dennis Farrar, NYSDEC
Bob Marino, NYSDEC
Eric Mosher, USEPA , Region 2, ERRD-RPB
Gilberto Irizarry, USEPA Headquarters
Tim Grier, USEPA Headquarters 5202G
Christopher Jimenez, USEPA Region 02
Paul Kahn, USEPA Region 02
Joe Rotola, USEPA Region 02
Michele Tabayoyong, USEPA Region 02
Beckett Grealish, USEPA Region 2, ERRD, RAB
Mark Pane, USEPA, Region 02, ERRD-RAB
James Daloia, USEPA, Region 2, ERRD-RPB
John Higgins, USEPA, Region 2, ERRD-RPB
Mary Mears, USEPA, Region 2, PAD
Mike DiPietro, NYSDEC
Elias Rodriguez, USEPA
John LaPadula, USEPA, Region 2 ERRD-NYRB
Walter Mugdan, USEPA
Joe Rotola, ERRD
George Zachos, ERRD
Tom Budroe, ERRD
|
|
From:
|
Dilshad Perera, OSC
|
|
Date:
|
12/2/2013
|
|
Reporting Period:
|
09-09-2013 to 10-10-2013
|
|
1. Introduction
|
|
|
1.1 Background
|
|
|
|
|
Site Number: |
A22N |
|
Contract Number: |
ESP-S2-10-01 |
|
D.O. Number: |
58 |
|
Action Memo Date: |
8/23/2013 |
|
Response Authority: |
CERCLA |
|
Response Type: |
Time-Critical |
|
Response Lead: |
EPA |
|
Incident Category: |
Removal Action |
|
NPL Status: |
Non NPL |
|
Operable Unit: |
|
|
Mobilization Date: |
10/17/2012 |
|
Start Date: |
10/18/2012 |
|
Demob Date: |
10/10/2013 |
|
Completion Date: |
10/10/2013 |
|
CERCLIS ID: |
NYN000206603 |
|
RCRIS ID: |
NYN000206603 |
|
ERNS No.: |
|
|
State Notification: |
|
|
FPN#: |
|
|
Reimbursable Account #: |
|
|
|
2. Current Activities
|
|
|
2.1 Operations Section
|
|
|
|
2.1.1 Narrative
2.1.2 Response Actions to Date
Period 09/09/13 to 09/20/2013, EPA and ERRS on site to:
- Collect samples for waste disposal characterization
- Field hazard categorization of containers less tha 5 gallons to determine appropriate loose packing group.
- Less than 5 gallon containers loose packed based on waste streams.
- Larger containers overpacked in to DOT shippable containers.
- Emptied containers de-headed and crushed.
- EPA and ERRS demobed from the site on 09/20/2013 whilst awaiting analytical results and awarding disposal subcontracting.
Period 10/09/2013 to 10/10/2013, EPA and ERRS on site to:
- Affix container labels.
- Coordinate off-site disposal shipments
As of 10/10/2013, all site activities have been completed and no further actions are anticipated.
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
2.1.4 Progress Metrics
| Waste Stream |
Medium |
Quantity |
Manifest # |
Treatment |
Disposal |
| Flammable |
solid |
4 cy |
011147369 |
N/A |
Ross Incineration Services, Inc.
36790 Giles Road, Grafton, OH 44044
H061 |
| Flammable |
Aerosols |
200 lb |
011147369 |
N/A |
Giant Resource Recovery
1229 Valley Drive, Attalla, AL 35954
H141 |
| Flammable (MEK) |
liquid |
95 gal |
011147369 |
N/A |
Keystone Cement Company
6507 Nor Bath Boulevard, Bath, PA 18014
H061 |
| Corrosive |
liquid |
95 gal |
011147369 |
N/A |
Waste Management Grows Landfill
1000 New Ford Mill Road, Morrisville, PA 19067
H110 |
| Sodium sulfide |
liquid |
110 gal |
011147369 |
N/A |
Waste Management Grows Landfill
1000 New Ford Mill Road, Morrisville, PA 19067
H110 |
| Cadmium |
liquid |
140 gal |
011147369 |
N/A |
RINECO Chemical
819 Vulcan Road, Benton, AR 72015
H061 |
| Chlordane |
liquid |
5 gal |
011147369 |
N/A |
Veolia Environmental Services
125 Factory Ln, Middlesex, NJ 08846
H141 |
| Corrosive |
liquid |
20 gal |
011147369 |
N/A |
Waste Management Grows Landfill
1000 New Ford Mill Road, Morrisville, PA 19067
H121 |
|
|
|
2.2 Planning Section
|
|
|
|
No information available at this time.
|
|
|
2.3 Logistics Section
|
|
|
|
No information available at this time.
|
|
|
2.4 Finance Section
|
|
|
|
|
|
|
|
| |
Budgeted |
Total To Date |
Remaining |
% Remaining |
|
Extramural Costs
|
| ERRS - Cleanup Contractor |
$150,000.00 |
$34,233.00 |
$115,767.00 |
77.18% |
|
Intramural Costs
|
| USEPA - Direct |
$10,000.00 |
$5,000.00 |
$5,000.00 |
50.00% |
| |
| Total Site Costs |
$160,000.00 |
$39,233.00 |
$120,767.00 |
75.48% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.
|
|
|
2.5 Other Command Staff
|
|
|
|
No information available at this time.
|
|
3. Participating Entities
|
|
|
No information available at this time.
|
|
4. Personnel On Site
|
|
|
No information available at this time.
|
|
5. Definition of Terms
|
|
|
No information available at this time.
|
|
6. Additional sources of information
|
|
|
No information available at this time.
|
|
7. Situational Reference Materials
|
|
|
No information available at this time.
|
|
POLREP #5 Last Updated 10/21/2014
|
|
|