1. Introduction
|
|
1.1 Background
|
|
|
Site Number: |
E13409 |
|
Contract Number: |
|
D.O. Number: |
|
|
Action Memo Date: |
|
Response Authority: |
OPA |
|
Response Type: |
Emergency |
Response Lead: |
EPA |
|
Incident Category: |
Removal Action |
NPL Status: |
Non NPL |
|
Operable Unit: |
|
Mobilization Date: |
2/5/2013 |
|
Start Date: |
2/5/2013 |
Demob Date: |
4/4/2013 |
|
Completion Date: |
4/4/2013 |
CERCLIS ID: |
|
|
RCRIS ID: |
|
ERNS No.: |
|
|
State Notification: |
2/4/2013 |
FPN#: |
E13409 |
|
Reimbursable Account #: |
|
1.1.1 Incident Category
Emergency Response to a release of crude oil from a pipeline into Waters of the U.S., in Bay Springs, Mississippi.
1.1.2 Site Description
At 1535, on February 5, 2013, Plains Pipeline contacted the NRC with notification of a discharge of crude oil from an eight inch Plains Pipeline in Heidelberg, MS into Piney Creek. MSDEQ responded and requested EPA Assistance. MDEQ and EPA estimate a release of approximately 100 barrels of crude oil from the transportation pipeline. The released product migrated overland from discharge point into Piney Branch a tributary of Tallahoma Creek. The discharge has impacted forested wetlands as well as Piney Branch but has not yet reached Tallahoma Creek. Response crews have established containment and recovery strategies. Recovery consists primarily of skimmers and pumps collecting oil. Response crews are actively pushing oil toward recovery points. Preliminary assessments show impacts through approximately the entire two miles distance from the source to the last downstream recovery point. The EPA and the State of Mississippi are directing the response.
1.1.2.1 Location
Heildelberg, Bay Springs, Jasper County, MS.
1.1.2.2 Description of Threat
Approximately 100 bbls of crude oil have impacted Piney Branch a tributary of the Tallahoma Creek.
|
2. Current Activities
|
|
2.1 Operations Section
|
|
|
2.1.1 Narrative
2.1.2 Response Actions to Date
All emergency response actions have been completed. EPA and MDEQ conducted Final SCAT assessment prior to transfer of oversight to State.
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
Plains All American Pipeline, L.P.
2.1.4 Progress Metrics
Waste Stream |
Medium |
Quantity |
Manifest # |
Treatment |
Disposal |
Crude Oil/water |
Liquids |
400 barrels |
|
Recycler |
|
Contaminated Soils |
Soil |
40 Tons |
|
|
|
Debris and Absorbent |
Various |
500 CY |
|
Recycler |
|
|
|
2.2 Planning Section
|
|
|
2.2.1 Anticipated Activities
None
2.2.1.1 Planned Response Activities
None
2.2.1.2 Next Steps
State to take over site for long term remediation
2.2.1.3 Issues
None
|
|
2.3 Logistics Section
|
|
|
No information available at this time.
|
|
2.4 Finance Section
|
|
|
No information available at this time.
|
|
2.5 Other Command Staff
|
|
|
No information available at this time.
|
3. Participating Entities
|
|
3.1 Unified Command
Plains Pipeline
US EPA
MSDEQ
3.2 Cooperating Agencies
|
4. Personnel On Site
|
|
EPA 1
MSDEQ 4
EPA to demobe on 4/4/2013
|
5. Definition of Terms
|
|
No information available at this time.
|
6. Additional sources of information
|
|
No information available at this time.
|
7. Situational Reference Materials
|
|
Refer to documents session for IAP and other supporting information
|