1. Introduction
|
|
1.1 Background
|
|
|
Site Number: |
C5ZB |
|
Contract Number: |
EP-S5-08-02 |
D.O. Number: |
0144 |
|
Action Memo Date: |
8/12/2014 |
Response Authority: |
CERCLA |
|
Response Type: |
Time-Critical |
Response Lead: |
EPA |
|
Incident Category: |
Removal Action |
NPL Status: |
Non NPL |
|
Operable Unit: |
|
Mobilization Date: |
9/22/2014 |
|
Start Date: |
9/22/2014 |
Demob Date: |
|
|
Completion Date: |
|
CERCLIS ID: |
|
|
RCRIS ID: |
None |
ERNS No.: |
|
|
State Notification: |
WDNR |
FPN#: |
|
|
Reimbursable Account #: |
|
1.1.1 Incident Category
Time Critical Removal Action
1.1.2 Site Description
The Site is a 2.8 acre lot with a 61,000 ft2 abandoned industrial building, formerly occupied by Wisconsin Die Casting, LLC, in a mixed residential, commercial, and industrial area. The Site building is currently vacant and has fallen into disrepair, with continuous and persistent trespassing by scavengers and vandals.
1.1.2.1 Location
The Site is located at 201 West Oklahoma Avenue in Milwaukee, Milwaukee County, Wisconsin.
1.1.2.2 Description of Threat
See POLREP #1
1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
See POLREP #1
|
2. Current Activities
|
|
2.1 Operations Section
|
|
|
2.1.1 Narrative
ERRS sub-contractors removed temporary power and re-secured the building and Site to deter trespassing. PCB sampling data was received, analyzed and discussed with City of Milwaukee and State of Wisconsin representatives to determine next steps (see Section 2.2.2)
2.1.2 Response Actions to Date
Site activities during the reporting period included the following:
- Secured building windows, skylights & doors;
- Disconnected and dismantled temporary power source;
- Re-secured perimeter fencing & gates; and
- Reviewed, tabulated & presented data from confirmatory sampling to City & State (see Section 2.2.2).
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
See POLREP #1
2.1.4 Progress Metrics
See POLREP #3
|
|
2.2 Planning Section
|
|
|
2.2.1 Anticipated Activities
During the next reporting period, the following activities are planned:
- Investigate nature & extent of subsurface contamination on east side & underneath building foundation;
- Conduct additional cleaning of floor trenches and drains in the building floor; and
- Develop a workpan to address additonal contamination which is or has the potential to migrate off-site.
2.2.1.1 Planned Response Activities
See Section 2.2.1
2.2.1.2 Next Steps
See Section 2.2.1 & 2.2.2.
2.2.2 Issues
Additional confirmatory samping was conducted which revealed elevated concentrations of PCBs in soils on the east side of the building and underneath the building foundation. Groundwater sampling from groundwater probe GP-12 within the building footprint showed PCB (Aroclor 1242) contamination of 110,000 mg/kg. See figures in 'documents' section of website for details of data/results. This data was presented to City and State officicals on 1/21/2015. During the meeting, EPA was urged to conduct additional investigation of nature & extent of this contamination and propose next steps or additional activities to address potential off site migration.
|
|
2.3 Logistics Section
|
|
|
Site logistics are provided by EQM, Inc.
|
|
2.4 Finance Section
|
|
|
No information available at this time.
|
|
2.5 Other Command Staff
|
|
|
2.5.1 Safety Officer
OSCs Kathy Halbur, Paul Ruesch and RM Mark Douglas serve as safety officers. A HASP was established for the project and signed by all personnel. Daily safety briefings are held each day before the start of work.
2.5.2 Liaison Officer
OSCs Kathy Halbur & Paul Ruesch
2.5.3 Information Officer
OSCs Kathy Halbur & Paul Ruesch
|
3. Participating Entities
|
|
3.1 Unified Command
N/A
3.2 Cooperating Agencies
City of Milwaukee
Redevelopment Authority (RACM)
Health Department
Police Department
Fire Department
Department of Neighborhood Services
Public Works Department
Water Department
State of Wisconsin
Department of Health Services
Department of Natural Resources
WE Energies
|
4. Personnel On Site
|
|
U.S. EPA - 1
ERRS (EQM, Inc.) - 2
TL Reese (sub-contractor) - 5
WE Energies - 2
TOTAL - 10
|
5. Definition of Terms
|
|
ACM - Asbestos Containing Material
EPA - Environmental Protection Agency
ERRS - Emergency & Rapid Response Services
HASP - Health and Safety Plan
MDNS - Milwaukee Department of Neighborhood Services
MDPW - Milwaukee Department of Public Works
MFD - Milwaukee Fire Department
mg/kg - milligrams per kilogram
MHD - Milwaukee Health Department
MFD - Milwaukee Fire Department
MPD - Milwaukee Police Department
NR - Natural Resources
OSC - On scene coordinator
PCBs -Poly-Chlorinated Biphenyls
ppb - parts per billion
ppm - parts per million
RACM - Redevelopment Authority of the City of Milwaukee
RCL - Residual Contaminant Level
RML - Removal Management Level
RM - Response Manager
START - Superfund Technical Assessment & Response Team
TDD - Technical Direction Document]
TO - Task Order
WDHS - Wisconsin Department of Health Services
WDNR - Wisconsin Department of Natural Resources
|
6. Additional sources of information
|
|
6.1 Internet location of additional information/report
http://epaosc.org/WisconsinDieCast
6.2 Reporting Schedule
The next POLREP will be issued once additional subsurface investigation is completed.
|
7. Situational Reference Materials
|
|
None
|