Pools Prairie MPA - OU6

All POL/SITREP's for this site Pools Prairie MPA - OU6
Neosho, MO - EPA Region VII
POLREP #6
Progress Report
Printer Friendly  |   PDF
 
U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Pools Prairie MPA - OU6 - Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region VII

Subject: POLREP #6
Progress Report
Pools Prairie MPA - OU6
07WT
Neosho, MO
Latitude: 36.8245986 Longitude: -94.3649180


To:
From: Todd Campbell, OSC
Date: 12/4/2015
Reporting Period: 8/1/15 - 12/4/15

1. Introduction
  1.1 Background
   
Site Number: 07WT    Contract Number:  
D.O. Number:      Action Memo Date: 6/4/2014
Response Authority: CERCLA    Response Type: Non-Time-Critical
Response Lead: PRP    Incident Category: Removal Action
NPL Status: NPL    Operable Unit: 06
Mobilization Date: 4/6/2015    Start Date: 5/4/2015
Demob Date:      Completion Date:  
CERCLIS ID:    RCRIS ID:
ERNS No.:    State Notification:
FPN#:    Reimbursable Account #:

1.1.1 Incident Category

Please refer to POLREP #1 for Incident Category.

1.1.2 Site Description

Please refer to POLREP #1 for Site Description.

1.1.2.1 Location

Please refer to POLREP #1 for Site Location.

1.1.2.2 Description of Threat

Please refer to POLREP #1 for Description of Threat.

1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results

Please refer to POLREP #1 for RA/RSE Results.

2. Current Activities
  2.1 Operations Section
    2.1.1 Narrative

Please refer to POLREP #1 for Site Narrative.

2.1.2 Response Actions to Date

Please refer to POLREPs 1-5 for previous response actions.

During the last few months, the PRP was able to treat the majority of the soil at the landfarm.  To date, approximately 7,650 cubic yards of material have been excavated and sent to the landfarm for remediation. Of that amount, roughly 4,000 cubic yards of material has been successfully remediated and 3,000 cubic yards hauled back to the excavation site and used as backfill.  Nine hundred feet of vapor extraction trench has been excavated and fitted with a fully functioning SVE system.  The system has been fully tested and is operating currently with ongoing monitoring to evaluate effectiveness. 

2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)

Please refer to POLREP #1 for PRP information. 

2.1.4 Progress Metrics


Waste Stream Medium Quantity Manifest # Treatment Disposal
 Soil  solid  7,650 yd3    land farming  n/a
           
           


  2.2 Planning Section
   

2.2.1 Anticipated Activities

Continue to run SVE and Biosparge system over the winter with periodic monitoring to evaluate effectiveness.

2.2.1.1 Planned Response Activities

See 2.2.1 above.

2.2.1.2 Next Steps

O and M and monitoring.

2.2.2 Issues

Ran out of warm weather to treat soils at the landfarm so have shut down treatment activities at the landfarm until springtime.

  2.3 Logistics Section
   
N/A

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    2.5.1 Safety Officer

The PRP is providing the SSO; the EPA OSC will be in charge of EPA safety.

2.5.2 Liaison Officer

N/A

2.5.3 Information Officer

Brendan Corazin is the CES for the site:

(913) 551-7429

3. Participating Entities
  3.1 Unified Command

N/A

3.2 Cooperating Agencies

US DOD
MO National Guard
USACE
EPA
MDNR

4. Personnel On Site
 
The PRP has a subcontractor who will visit the site periodically to conduct O and M and monitoring over the course of the winter. 

5. Definition of Terms
 
N/A

6. Additional sources of information
  6.1 Internet location of additional information/report

N/A

6.2 Reporting Schedule

POLREPS will be generated quarterly from now on, or as needed, until further notice.

7. Situational Reference Materials
 
RSE
EE/CA
AR
Action Memorandum
AOC