1. Introduction
|
|
1.1 Background
|
|
|
Site Number: |
07WT |
|
Contract Number: |
|
D.O. Number: |
|
|
Action Memo Date: |
6/4/2014 |
Response Authority: |
CERCLA |
|
Response Type: |
Non-Time-Critical |
Response Lead: |
PRP |
|
Incident Category: |
Removal Action |
NPL Status: |
NPL |
|
Operable Unit: |
06 |
Mobilization Date: |
4/6/2015 |
|
Start Date: |
5/4/2015 |
Demob Date: |
|
|
Completion Date: |
|
CERCLIS ID: |
|
|
RCRIS ID: |
|
ERNS No.: |
|
|
State Notification: |
|
FPN#: |
|
|
Reimbursable Account #: |
|
1.1.1 Incident Category
Please refer to POLREP #1 for Incident Category.
1.1.2 Site Description
Please refer to POLREP #1 for Site Description.
1.1.2.1 Location
Please refer to POLREP #1 for Site Location.
1.1.2.2 Description of Threat
Please refer to POLREP #1 for Description of Threat.
1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
Please refer to POLREP #1 for RA/RSE Results.
|
2. Current Activities
|
|
2.1 Operations Section
|
|
|
2.1.1 Narrative
Please refer to POLREP #1 for Site Narrative.
2.1.2 Response Actions to Date
Please refer to POLREPs 1-5 for previous response actions.
During the last few months, the PRP was able to treat the majority of the soil at the landfarm. To date, approximately 7,650 cubic yards of material have been excavated and sent to the landfarm for remediation. Of that amount, roughly 4,000 cubic yards of material has been successfully remediated and 3,000 cubic yards hauled back to the excavation site and used as backfill. Nine hundred feet of vapor extraction trench has been excavated and fitted with a fully functioning SVE system. The system has been fully tested and is operating currently with ongoing monitoring to evaluate effectiveness.
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
Please refer to POLREP #1 for PRP information.
2.1.4 Progress Metrics
Waste Stream |
Medium |
Quantity |
Manifest # |
Treatment |
Disposal |
Soil |
solid |
7,650 yd3 |
|
land farming |
n/a |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2.2 Planning Section
|
|
|
2.2.1 Anticipated Activities
Continue to run SVE and Biosparge system over the winter with periodic monitoring to evaluate effectiveness.
2.2.1.1 Planned Response Activities
See 2.2.1 above.
2.2.1.2 Next Steps
O and M and monitoring.
2.2.2 Issues
Ran out of warm weather to treat soils at the landfarm so have shut down treatment activities at the landfarm until springtime.
|
|
2.3 Logistics Section
|
|
|
N/A
|
|
2.4 Finance Section
|
|
|
No information available at this time.
|
|
2.5 Other Command Staff
|
|
|
2.5.1 Safety Officer
The PRP is providing the SSO; the EPA OSC will be in charge of EPA safety.
2.5.2 Liaison Officer
N/A
2.5.3 Information Officer
Brendan Corazin is the CES for the site:
(913) 551-7429
|
3. Participating Entities
|
|
3.1 Unified Command
N/A
3.2 Cooperating Agencies
US DOD
MO National Guard
USACE
EPA
MDNR
|
4. Personnel On Site
|
|
The PRP has a subcontractor who will visit the site periodically to conduct O and M and monitoring over the course of the winter.
|
5. Definition of Terms
|
|
N/A
|
6. Additional sources of information
|
|
6.1 Internet location of additional information/report
N/A
6.2 Reporting Schedule
POLREPS will be generated quarterly from now on, or as needed, until further notice.
|