On May 30, 2019, EPA’s ERRS contractor was onsite to provide removal of mercury and cleanup of mercury contamination. ERRS removed tile flooring, base layer of tile mastic, decontaminated surfaces, and heated the room with space heaters while maintaining negative air pressure, recycling the air within the storage room. Porous items that were contaminated were disposed of appropriately. CDPHE also surrendered additional mercury thermometers (approximately 14 thermometers) that will taken for proper disposal. START provided air monitoring of the area utilizing the Lumex and Jerome 431-X. The floor was then sealed twice with an epoxy-based sealant. Final ambient air mercury vapor concentrations were below 1,000ng/m3, action level recommended for protection of sensitive populations.
EPA and EPA contractors demobilized personnel and equipment from the site on June 5, 2019.