Cinnabar Mine Integrated Assessment

Documents

All Documents [7]
Categories
File Name Description Category Uploaded Size Download 
1.9_10-31-18_Cinnabar Mine_Final 2018 Removal Site Evaluation Summary Report.pdf Report of EPA's 2018 Field Activities Report 10/31/2018 42898 KB Download
1.9_9-8-17_Cinnabar Mine_Final Integrated Assessment.pdf Complete report with all appendices from EPA's August 2016 assessment at Cinnabar Mine. Report 9/29/2017 128381 KB Download
1.9_9-8-17_Cinnabar Mine_Final Integrated Assessment_wo Appendices.pdf Report without appendices from EPA's August 2016 assessment at Cinnabar Mine. Report 9/29/2017 21954 KB Download
Eckley 2016 Methylation Studies Addendum.pdf Chris Eckley's ancillary study on methlyation potential at Cinnabar Mine. This is also available as Appendix B of the Integrated Assessment report.

TITLE: Methylmercury at the abandoned Cinnabar Mine, ID: Assessment of current conditions and potential impacts of remediation actions involving organic carbon additions.
Report 9/29/2017 636 KB Download
Cinnabar Closure Memo_FINAL signed.pdf EPA Removal Program's Closure Memo completing it's Removal Site Evaluation conducted from 2016 through 2018. Decision Memorandum 2/21/2019 574 KB Download
1.9_8-19-16_Cinnabar Mine_Final IA SSSP.pdf Site Specific Sampling Plan outlines the detailed approach to EPA's August 2016 Integrated Assessment. Sampling Plan 9/27/2017 6342 KB Download
1.9_12-26-14_Cinnabar Mine_Final Trip Report.pdf 2014 Sampling Trip Report Report 3/10/2015 23334 KB Download