Wrigley Charcoal Plant Site

Images

All Images [43]
Categories
The ERRS contractor used the excavator with the grappler attachment to demolish the remaining structural steel located at the south end of the north building.  The water truck was used for dust suppression.<br />Date Taken: 7/30/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
The ERRS contractor used the excavator with the grappler attachment to demolish the remaining structural steel located at the south end of the north building.  The water truck was used for dust suppression.<br />Date Taken: 7/30/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
The ERRS contractor cut the structural steel and used cables attached to the excavators with the shear and grappler attachments to demolish the south end of the north building.  The water truck was used for dust suppression.<br />Date Taken: 7/30/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
The ERRS contractor cut the structural steel and used cables attached to the excavators with the shear and grappler attachments to demolish the south end of the north building.  The water truck was used for dust suppression.<br />Date Taken: 7/30/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
The ERRS contractor cut the structural steel and used cables attached to the excavators with the shear and grappler attachments to demolish the south end of the north building.  The water truck was used for dust suppression.<br />Date Taken: 7/30/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
The ERRS contractor used an extended reach excavator to demolish the northwest wall of the north building.  The water truck provided dust suppression during demolition.<br />Date Taken: 7/29/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
The ERRS contractor used an extended reach excavator to demolish the northwest wall of the north building.  The water truck provided dust suppression during demolition.<br />Date Taken: 7/29/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
After washing wash completed, START visually inspected the floor for any remaining visible asbestos-contaminated debris.  Since there appeared to be no debris, the ERRS contractor prepared to demolish the northwest wall of the north building.<br />Date Taken: 7/29/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
After removal of asbestos-contaminated debris from the floor of the north building, the ERRS contractor washed the floor prior to the demolition of the northwest wall.<br />Date Taken: 7/29/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
ERRS contractor used the water truck to wash structural steel prior to staging for recycling.<br />Date Taken: 7/29/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
The ERRS contractor used excavators with a shear attachment and a grappler attachment to remove structural steel from the north building.  A water truck was used to provided dust suppression.<br />Date Taken: 7/28/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Demolition debris mixed with asbestos-contaminated material was staged and placed into lined roll offs for disposal at a State of Tennessee approved asbestos landfill.<br />Date Taken: 7/28/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
The ERRS contractor demolished the northwest room of the north building.<br />Date Taken: 7/28/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Demolition debris mixed with asbestos-containing materials was staged and placed into lined roll offs for disposal at a State of Tennessee approved asbestos landfill.<br />Date Taken: 7/28/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
After demolition of the north wall of the north building, the ERRS contractor began removing the structural steel.  The steel was washed using a water truck and staged for recycling through a local vendor.<br />Date Taken: 7/28/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
The START contractor conducted perimeter air monitoring off site near residential areas.<br />Date Taken: 7/27/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
The START contractor, a State of Tennessee accredited asbestos project monitor, conducted perimeter air monitoring on site outside of the regulated area.<br />Date Taken: 7/27/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
The ERRS contractor used an extended reach excavator to demolish the wall above the northeast room of the north building.  A water truck was used during demolition for dust suppression.<br />Date Taken: 7/27/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Prior to staging the demolition debris, the START contractor, a State of Tennessee accredited asbestos project monitor, conducted a visual inspection of the debris.  If there appeared to be no asbestos-containing materials mixed with the debris, the ERRS contractor placed the debris in the staging area north of the north building.<br />Date Taken: 7/27/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
ERRS contractor used an extended reach excavator to begin demolition of the north wall of the north building.<br />Date Taken: 7/27/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
ERRS contractor lined the disposal roll offs with two layers of plastic sheeting.  Each layer was folded "burrito" style and sealed with spray glue.  Generator information was attached to the top of the plastic sheeting.<br />Date Taken: 7/27/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
ERRS contractor performed a surface scrape of the soil located north of the north building to stage demolition debris that appeared to not be contaminated with asbestos debris.<br />Date Taken: 7/27/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
ERRS contractor removed asbestos-contaminated debris from the window sills of the north building prior to demolition.<br />Date Taken: 7/27/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
ERRS contractor removed metal and fire damaged equipment from the north building.  They also removed the gross asbestos-contaminated debris from the north end of the building prior to demolition.<br />Date Taken: 7/25/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
ERRS contractor used a skid steer to remove metal and fire damaged equipment from the north building.<br />Date Taken: 7/23/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Disposal of demolition debris from the office building.<br />Date Taken: 7/22/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Demolition of the office building located near the southeast corner of the north building.  Demolition of the office building was conducted using a trackhoe with a grappling attachment.  Dust suppression with provided by a water truck with a hose attachment.<br />Date Taken: 7/22/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Demolition of the office building located near the southeast corner of the north building.  Demolition was conducted using a trackhoe with a grappling attachment and dust suppression was provided by a water truck with a hose attachment.<br />Date Taken: 7/22/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Waste generator labels were spray glued to the surface of the plastic sheeting inside the roll off prior to transportation to the State of Tennessee approved landfill for disposal.<br />Date Taken: 7/22/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Asbestos-contaminated debris was wrapped "burrito" style in two layers of 6-mil plastic sheeting and sealed with spray glue.<br />Date Taken: 7/22/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Asbestos warning signs were posted on the exterior of the disposal roll offs.<br />Date Taken: 7/22/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Asbestos signs and hazard tape were placed around the perimeter of the site to restrict access to non authorized personnel.<br />Date Taken: 7/22/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
A three-stage decontamination unit was placed at the workers entrance to the work zone.  Asbestos signs and hazard tape were placed around the perimeter of the site.<br />Date Taken: 7/22/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Disposal of asbestos-contaminated debris into a roll off lined with two layers of 6-mil plastic sheeting.<br />Date Taken: 7/22/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:

North building<br />Date Taken: <br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:

Floor of south building<br />Date Taken: <br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
ACM mixed with brick<br />Date Taken: <br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Interior floor office area<br />Date Taken: <br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
South Building<br />Date Taken: <br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: