U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Tanapag Fuel Farm Project

Images

All Images [73]
Categories
<<  <  1 2 3 4  >  >> 
CNMI DEQ and EPA START contractor work together to collect soil samples for field test kit correlation at Tank 13.<br />Date Taken: 4/12/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
CNMI DEQ project team members help remove solid waste and debris at Tank 10.<br />Date Taken: 4/18/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Pool of oil uncovered at Tank 10 after partial excavation and removal of tank metal.<br />Date Taken: 4/20/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Scrap metal is loaded onto truck for transport to metal recycler.<br />Date Taken: 4/24/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Soil excavation and waste management continues at Tank 10.  Metal bottom of Tank 10 is visible in foreground of photo.<br />Date Taken: 4/24/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Tank 10 cutting<br />Date Taken: 4/20/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Tank 10 ops<br />Date Taken: 4/19/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Metal Decon ops at Tank 10<br />Date Taken: 4/22/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Vegetation clearing for Tank 13<br />Date Taken: 4/24/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Access road to Tank 14<br />Date Taken: 4/24/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Metal departing Tank 10<br />Date Taken: 4/24/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Vegetation clearing Tank 13<br />Date Taken: 4/24/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
UXO class taught by the Corps<br />Date Taken: 4/25/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Tank bottom cutting Tank 10<br />Date Taken: 4/25/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Below Tank 10 bottom, stockpile of soil and silt fence<br />Date Taken: 4/25/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
inside Tank 13<br />Date Taken: 4/25/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
START and DEQ water sampling at Tank 13<br />Date Taken: 4/27/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
START and DEQ conducting XRF prep<br />Date Taken: 4/25/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Decon of Tank 12 bottom<br />Date Taken: 5/7/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Tank 14 metal removal<br />Date Taken: 4/25/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags: