U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Countywide Landfill

Images

All Images [167]
Categories
<<  <  1 2 3 4 5  ...  >  >> 
Bucket auger drill rig<br />Date Taken: 7/8/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Tapping into the vapor exctraction system for well PW-358.<br />Date Taken: 7/8/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Air monitoring station downwind of PW-358; summa canister on ground, UltraRAE ppb PID monitor on stand.<br />Date Taken: 7/8/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Installation of PW-358 well casing.<br />Date Taken: 7/8/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Rotosonic drill rig at the location of FBMP-03R.<br />Date Taken: 7/17/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Rotosonic drill rig at the location of FBMP-01R.<br />Date Taken: 7/17/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
New thermocouple down-hole temperature probe.<br />Date Taken: 7/18/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Rotosonic drill rig at the location of FBMP-04R.<br />Date Taken: 7/18/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Testing the leads of a new thermocouple temperature probe.<br />Date Taken: 7/18/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Installation of a new thermocouple temperature probe at FBMP-04R.<br />Date Taken: 7/18/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Well RW-03, installed 02/16/2008.<br />Date Taken: 7/18/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Initial ground cover removal in Area D.<br />Date Taken: 7/28/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Removal of ground cover in Area D.<br />Date Taken: 7/29/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Rotosonic drill rig in operation at subsurface temperature monitoring point FBMP-14.<br />Date Taken: 7/29/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Republic contractors trenching in Area D for the installation of landfill gas and leachate collector PVC piping.<br />Date Taken: 7/29/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Republic contractors backfilling #9 stone onto the sub-cap landfill gas collector in Area D.<br />Date Taken: 7/30/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
An air sampling station upwind of Area D operations (summa canister, ppb PID)<br />Date Taken: 7/31/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
PVC risers installed in the sub-cap landfill gas collector in Area D.<br />Date Taken: 7/31/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Trench excavation work for the installation of leachate and landfill gas collector pipes on the east slope of Area N.<br />Date Taken: 8/7/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Installation of flexible membrane liner (FML) on the north plateau of Area N.<br />Date Taken: 8/8/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags: