U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Bremerton Gasworks

Images

All Images [38]
Categories
Spill area, Kitsap Health District staff<br />Date Taken: 10/5/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Unrelated stormwater outfall pipe near affected pipe<br />Date Taken: 10/5/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Closeup of open join on leaking pipe<br />Date Taken: 10/5/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Uncovering leaking pipe<br />Date Taken: 10/5/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
part of affected pipe<br />Date Taken: 10/5/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
sampling prodcut leaking from pipe<br />Date Taken: 10/5/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Tank on beach<br />Date Taken: 10/5/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Port of Washington Narrows<br />Date Taken: 10/5/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Kitsap Health District posted warning signs at each acccess to the site cautioning visitors of the contaminated area.<br />Date Taken: 10/9/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Two level boom placed around contaminated area on 10/8/2010.<br />Date Taken: 10/9/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Removal Assessment and air monitoring during low tide on 10/ 8-10/9/2010: USCG Sector Puget Sound, USCG Pacific Strike Team, USEPA, START, Global Diving.<br />Date Taken: 10/9/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Excavating pipe to assess creosote flow.<br />Date Taken: 10/9/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Sampling - checking for visible creosote.<br />Date Taken: 10/9/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Nearby stormwater discharge pipe.<br />Date Taken: 10/10/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Creosote flowing from  pipe joint.<br />Date Taken: 10/10/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Exposed sections of pipe inland from leaking joint.<br />Date Taken: 10/10/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Using absorbent pads to blot up creosote flowing from pipe.<br />Date Taken: 10/10/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Putting down more absorbent pads to blot creosote.<br />Date Taken: 10/10/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Warning signs posted by Kitsap Health District. <br />Date Taken: 10/9/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Excavating pipe for removal assessment.<br />Date Taken: 10/10/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Nearby loose section of pipe in water - stood up on end to assess.<br />Date Taken: 10/10/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
USCG decon station for  10/8-9/2010night removal assessment.<br />Date Taken: 10/10/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Close-up of sediment fence - lower level of two-level containment boom.<br />Date Taken: 10/10/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Close-up of the two levels of containment boom - inner is staked to ground to contain DNAPL, outer level is tied to floats to contain LNAPL sheen. Tide is at lowest extreme.<br />Date Taken: 10/10/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Trench dug to expose pipe after filling back in before demobing from site.<br />Date Taken: 10/10/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Rolling out first sheet of organoclay mat on the beach early in the morning on Columbus Day 2013.<br />Date Taken: 10/14/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: Removal Action 2013
First Sheet in place on the beach.
<br />Date Taken: 10/14/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: Removal Action 2013
Second sheet of organoclay mat in place on the beach.
<br />Date Taken: 10/14/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: Removal Action 2013
Third sheet of organoclay mat in place on the beach.
<br />Date Taken: 10/14/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: Removal Action 2013
Beach after first day of placement of mats.<br />Date Taken: 10/14/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: Removal Action 2013
Second Day of mat placement. Mat 4 in place at base of slope.<br />Date Taken: 10/15/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: Removal Action 2013
OSC and PRP rep overseeing removal action.
<br />Date Taken: 10/14/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: Removal Action 2013
Completed cap covered with imported beach material.
<br />Date Taken: 10/15/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: Removal Action 2013
Preparing Manhole A for capping.
<br />Date Taken: 10/15/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: Removal Action 2013
Manhole A exposed and cleaned prior to mounting risers and cap.
<br />Date Taken: 10/15/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: Removal Action 2013
Installing risers on Manhole A.
<br />Date Taken: 10/15/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: Removal Action 2013
Manhole A capping completed and site boundary blocks returned to original locations.
<br />Date Taken: 10/15/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: Removal Action 2013
Exit pipe, believed to lead to Manhole A,  capped inside nearby concrete containment cell.  
<br />Date Taken: 10/15/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: Removal Action 2013