POLREP #6
Initial and Final Polrep for 2013 Removal Action
Printer Friendly  |   PDF
 
U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Bremerton Gasworks - Removal Polrep
Initial and Final Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region X

Subject: POLREP #6
Initial and Final Polrep for 2013 Removal Action
Bremerton Gasworks
10JS
Bremerton, WA
Latitude: 47.5773250 Longitude: -122.6421064


To:
From: Kathy Parker, OSC
Date: 11/4/2013
Reporting Period: 10/8/2013 - 11/4/2013

1. Introduction
  1.1 Background
   
Site Number: 10JS    Contract Number:  
D.O. Number:      Action Memo Date: 9/30/2013
Response Authority: CERCLA    Response Type: Emergency
Response Lead: EPA    Incident Category: Removal Action
NPL Status: Non NPL    Operable Unit: Beach
Mobilization Date: 10/8/2010    Start Date: 10/8/2010
Demob Date: 11/4/2013    Completion Date: 11/4/2013
CERCLIS ID: WAN001002907    RCRIS ID:
ERNS No.:    State Notification:
FPN#:    Reimbursable Account #:

1.1.1 Incident Category
PRP-led Time Critical Removal Action at an NPL Site.

1.1.2 Site Description
Previously operated as Bremerton Gasworks, a manufactured gas production and storage facility, the site is now a privately owned mini-storage facility, an additional privately owned and unused property, and an adjacent beach managed by the Department of Natural Resources.
 
1.1.2.1 Location
Pennsylvania Avenue, Bremerton, WA.

1.1.2.2 Description of Threat
Polyaromatic hydrocarbons and oily liquid have been seen on the beach and have caused a sheen in Port of Washington Narrows.

1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
A removal assessment performed in July 2013 found widespread contamination of the beach with polyaromatic hydrocarbons above the site-specific carcinogenic risk level of 8 mg/kg.

2. Current Activities
  2.1 Operations Section
    2.1.1 Narrative

2.1.2 Response Actions to Date
This Time-Critical Removal Action was performed by Cascade Natural Gas and its contractors.  On 5/31/2013, EPA and Cascade Natural Gas signed an agreement to perform a removal evaluation, a removal action, and a remedial investigation.  Cascade immediately began planning the removal evaluation which they performed in July 2013.

The removal evaluation identified widespread polyaromatic hydrocarbon contamination of the beach.  Cascade also found black oily liquid under the beach surface near the old winch house. Cascade agreed to perform a removal action to cover and contain the oily liquid to prevent it from migrating and to prevent people from coming in contact with it. Due to the extensive spread of PAH contamination on the beach, EPA agreed that additional beach cleanup would be better addressed by the EPA Remedial Program. 

EPA approved a Time-Critical Removal Action Memorandum on 9/30/2013. Cascade began the Time-Critical Removal Action on 10/8/2013 and completed it on 11/4/2013. The Removal Action consisted of numerous tasks, the primary one being capping a section of oil-contaminated beach with a 50' by 50' organo-clay mat.

2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
Cascade Natural Gas is a PRP and has an AOC in place with EPA.  Other PRPs have also been identified and may be contacted during the RI/FS phase.

2.1.4 Progress Metrics

Waste Stream Medium Quantity Manifest # Treatment Disposal
           
           
           


  2.2 Planning Section
    No information available at this time.

  2.3 Logistics Section
    No information available at this time.

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    No information available at this time.

3. Participating Entities
  No information available at this time.

4. Personnel On Site
  Cascade Natural Gas contracted with three environmental firms to perform the removal action:
Aspect Environmental - upland technical oversight
Anchor QEA - marine/beach technical oversight
Clear Creek - contracted with a crane service and performed the removal action tasks.

A representative of Cascade Natural Gas was on-site during removal activities.

The OSC was on-site only on 10/14/2013 because the performance of the removal action coincided with a 16 day federal government shutdown. The removal action was not postponed due to the shutdown because restrictions caused by the scarcity of low tides and an impending closure of the fish window for beach work would have delayed the action until the Summer of 2014. 

5. Definition of Terms
  No information available at this time.

6. Additional sources of information
  No information available at this time.

7. Situational Reference Materials
  Contractors to Cascade Natural Gas will be producing a Removal Evaluation report and a Removal Action report which will describe the details of both activities. These reports and the Action Memorandum will be posted to this website.