U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Action Resources Tanker Truck HCL Spill

Images

All Images [14]
Categories
Tanker truck prior to neutralization process<br />Date Taken: 5/7/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
RP contractor neutralizing load contents in Level B utilizing Sodium Bicarbonate<br />Date Taken: 5/7/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Neutralization conducted in Level B<br />Date Taken: 5/7/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Whitesboro FD providing decon to RP cleanup contractors in Level B<br />Date Taken: 5/7/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Sorbent boom in foreground placed in front of drainage pathway.  <br />Date Taken: 5/7/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
RP contractor washing Sodium Bicarbonate off of highway<br />Date Taken: 5/7/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
High pressure washing of highway after neutralization on highway has been completed<br />Date Taken: 5/7/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
remaining tanker truck load contents transferred to additional truck for transport<br />Date Taken: 5/7/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Tanker truck just prior to being uprighted<br />Date Taken: 5/7/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
tanker truck in process of being uprighted by RP contractor<br />Date Taken: 5/7/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
tanker truck after truck has had remaining contents removed and been uprighted.<br />Date Taken: 5/7/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
START contractor collecting soil background sample to test for pH<br />Date Taken: 5/7/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Area impacted by tanker truck rollover after truck has been removed.  Soil excavation as per TCEQ still required in area.<br />Date Taken: 5/7/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Contaminated soil mixed with minimal DI water to allow pH paper to react.  pH is approximately pH of 2.<br />Date Taken: 5/7/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: