1. Introduction
|
|
|
1.1 Background
|
|
|
|
|
Site Number: |
A6EH |
|
Contract Number: |
|
|
D.O. Number: |
|
|
Action Memo Date: |
|
|
Response Authority: |
CERCLA |
|
Response Type: |
Emergency |
|
Response Lead: |
PRP |
|
Incident Category: |
|
|
NPL Status: |
Non NPL |
|
Operable Unit: |
|
|
Mobilization Date: |
5/7/2012 |
|
Start Date: |
|
|
Demob Date: |
5/7/2012 |
|
Completion Date: |
|
|
CERCLIS ID: |
TXN000607416 |
|
RCRIS ID: |
|
|
ERNS No.: |
1010747 |
|
State Notification: |
TCEQ Responded |
|
FPN#: |
|
|
Reimbursable Account #: |
|
1.1.1 Incident Category: Emergency Response
1.1.2 Site Description: At approximately 0900 hours on 7 May 2012 Action Resources Inc., the Potentially Responsible Party (PRP), notified the National Response Center (NRC Report No. 1010747) of an incident that occurred at 0810 hours on 7 May 2012. The incident involved a tractor-trailer transporting 16% Hydrochloric Acid (HCl) to a facility located in Valley View, TX. Reportedly, the tractor trailer overturned due to operator/driver error on westbound State Highway 82, approximately 5 miles east of Whitesboro, Grayson County, Texas. The accident resulted in the release of the majority of approximately 4,500 gallons of the HCl carried by the tanker onto the road and into the Texas Department of Transportation (TXDOT) Right-of-Way (ROW) runoff ditch.
1.1.2.1 Location: Approximately 5 miles east of Whitesboro, Grayson County, Texas
1.1.2.2 Description of Threat: Hydrochloric Acid (HAZMAT)
|
|
2. Current Activities
|
|
|
2.1 Operations Section
|
|
|
|
On 9 May 2012, EPA START contacted TCEQ to gather updated information on activities conducted after EPA and START departed the site on the evening of 7 May 2012. TCEQ reported that the RP cleanup contractors removed the first few inches of soil around the localized area of the spill prior to TCEQ departing the scene. This area was confirmed to have a pH around 7 utilizing field instrumentation. TCEQ reported they departed the scene at approximately 2100 on 7 May 2012. The RP contractor continued to work throughout the night and completed the soil removal in accordance with TCEQ and TXDOT guidelines by the morning of 8 May 2012. TCEQ reported that three rolloff containers were filled with removed soil materials for offsite disposal. TCEQ also reported that they have requested the RP to collect laboratory confirmation samples to be analyzed for pH. TCEQ also reported that TXDOT will revegetate the area where the soil has been removed once cleanup activities are complete and confirmation samples have been collected.
|
|
|
2.2 Planning Section
|
|
|
|
Anticipated Activities: TCEQ will continue to oversee RP activities. No other activities will be conducted by EPA.
Issues: NONE.
|
|
|
2.3 Logistics Section
|
|
|
|
Not applicable.
|
|
|
2.4 Finance Section
|
|
|
|
No information available at this time.
|
|
|
2.5 Other Command Staff
|
|
|
|
Not applicable.
|
|
3. Participating Entities
|
|
|
Grayson County Fire Department and Sheriff Office
TX DPS
TX DOT
EPA
TCEQ
|
|
4. Personnel On Site
|
|
|
Not applicable.
|
|
5. Definition of Terms
|
|
|
Not applicable.
|
|
6. Additional sources of information
|
|
|
Not applicable.
|
|
7. Situational Reference Materials
|
|
|
Not applicable.
|