U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Wrigley Charcoal Plant Site

Images

All Images [43]
Categories
<<  <  1 2 3 4 5  ...  >  >> 
Image  Description Category Date Tags
P1050445.JPG<br />Date Taken: 7/30/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: The ERRS contractor used the excavator with the grappler attachment to demolish the remaining structural steel located at the south end of the north building. The water truck was used for dust suppression. Site Photo 7/30/2015
P1050443.JPG<br />Date Taken: 7/30/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: The ERRS contractor used the excavator with the grappler attachment to demolish the remaining structural steel located at the south end of the north building. The water truck was used for dust suppression. Site Photo 7/30/2015
P1050435.JPG<br />Date Taken: 7/30/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: The ERRS contractor cut the structural steel and used cables attached to the excavators with the shear and grappler attachments to demolish the south end of the north building. The water truck was used for dust suppression. Site Photo 7/30/2015
P1050433.JPG<br />Date Taken: 7/30/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: The ERRS contractor cut the structural steel and used cables attached to the excavators with the shear and grappler attachments to demolish the south end of the north building. The water truck was used for dust suppression. Site Photo 7/30/2015
P1050431.JPG<br />Date Taken: 7/30/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: The ERRS contractor cut the structural steel and used cables attached to the excavators with the shear and grappler attachments to demolish the south end of the north building. The water truck was used for dust suppression. Site Photo 7/30/2015