Trowbridge Dam Area

Basemap:
Description: Sheet pile installation with turbidity control (fixed boom) downstream of work area
Date Taken: 11/18/2024
Category: Site Photo
Latitude:
42.4816972222222
Longitude:
-85.7853694444444
Tags:
POLREP39733
 
  • 26th St staging area preparation and sta...
  • Boat crew taking riverbank soil core sam...
  • Work crews taking river sediment cores v...
  • Land Rover conducting deep soil borings ...
  • Trowbridge Staging Area (TBSA) at 26th S...
  • SPA construction status - 10/24/2024
  • Crane Pad at TBSA on 26th Street
  • Sheet piling installation along floodpla...
  • Sheet pile installation in Subarea G
  • Sheet pile installation in Subarea G
  • Sheet pile installation with turbidity c...
  • Sheet pile installation along shoreline
  • View of Subarea E facing SW with sheet p...
  • Water Treatment System under constructio...
  • Hydraulic dredging unit assembly at stag...
  • Land clearing on RDB upstream of Trowbri...
  • The 'Michael B' hydraulic dredge barge w...
  • Wet sediments will be processed, dried a...