Ashton Texaco Oil Release

All POLREP's for this site Ashton Texaco Oil Release
Ashton, ID - EPA Region X
POLREP #19 - Progress
Printer Friendly  |   PDF
 
On-Scene Coordinator - Michael Szerlog 1/19/2005
Emergency - Removal Action Pollution Report (POLREP) #19
Start Date: 5/27/2003
Pollution Report (POLREP) #19
Site Description
See polrep number 1.

Current Activities
December 1 through 5, 2004:  ERRS Subcontracotr (1) ERRS Subcontractor conducted operations and maintenance activities.  A total of 191 gallons of material recovered to date in the 1,000 gallon tank.

December 6 through 12, 2004:  ERRS Subcontracotr (1) ERRS Subcontractor conducted operations and maintenance activities.  A total of 191 gallons of material recovered to date in the 1,000 gallon tank.

December 13 through 19, 2004:  ERRS Subcontracotr (1) ERRS Subcontractor conducted operations and maintenance activities.  A total of 191 gallons of material recovered to date in the 1,000 gallon tank.

December 20 through 26, 2004:  ERRS Subcontracotr (1) ERRS Subcontractor conducted operations and maintenance activities.  A total of 191 gallons of material recovered to date in the 1,000 gallon tank.

December 27 through 31, 2004:  ERRS Subcontracotr (1) ERRS Subcontractor conducted operations and maintenance activities.  A total of 192 gallons of material recovered to date in the 1,000 gallon tank.


Planned Removal Actions
-Continue to recover oil.
-During the week of February 14th 2005, EPA plans to install a groundwater depression pumping system inside of the current extraction wells to increase the efficiency of oil removal.  The pumping system will continuously pump groundwater from the three on site extraction wells, treat the groundwater, and then discharge it (under permit) to the city of Ashton's POTW.


Next Steps
-Transportation and Disposal of recovered product as needed.
-Amended Oil Removal Project Plan to address the installation of groundwater depression pumping systems was approved by USCG NPFC for funding.
-EPA to mobilize week of February 14, 2005 to install pumping system.
-EPA will operate these systems for another 6 months and then re-evaluate.


Key Issues
New Budget listed below - USCG NPFC approval of amended Oil Removal Project Plan.