See polrep number 1.
November 1 through 8, 2003: ERRS subcontractor (1) ERRS subcontractor conducted operations and maintenance activities. A total of 64 gallons of material recovered in the 1,000 gallon tank. November 9 through 15, 2003: ERRS Subcontractor (1) ERRS Subcontractor conducted operations and maintenance activities, including cleaning the fuel extraction pumps. A total of 68 gallons of material recovered in the 1,000 gallon tank.
November 16 through 25, 2003: ERRS Subcontractor (1) ERRS Subcontractor conducted operations and maintenance activities. A total of 79 gallons of material recovered in the 1,000 gallon tank.
-Operate system for 6 month period and re-evaluate.
-Transportation and Disposal of recovered product as needed. -EPA will re-evaluate the need to operate the system after 6-months.
None
|