See previous POLREPS for Site Description
On March 18, 2001, EPA, ERRS, and START remobilized to the site to complete site restoration activities. Clean topsoil was delivered to the site. ERRS spread topsoil, reseeded disturbed areas, and covered reseeded areas with straw. ERRS also added topsoil and reseeded and spread straw on two small areas on a neighboring property that had been disturbed by heavy truck traffic during removal activities. On March 18, 2010, additional topsoil was delivered to the site, and ERRS continued spreading topsoil, reseeding, and spreading straw. Site restoration activities were completed on March 18, 2010. START recorded photographic and video documentation of post-removal conditions at the site. EPA, ERRS, and START demobilized from the site on March 18, 2010.
No additional removal activities are planned for the site at this time.
|