See Initial Pol Rep
On May 12, 2010 Region 4 signed a removal action memorandum to begin the fund lead removal. Please see the AM in the Documents section. Work at the Site began the week of May 26, 2010 with building inspections and demolition. Demolition on main plating building including concrete pad was completed with concrete being staged for later removal from site. Surface water was pumped to an onsite frac tank
Additional demolition will continue to remove all structures on Site. The rental and use of a Frac Tank to capture on Site contaminated water for future disposal.
Concrete and water runoff issues will be addressed as limiting offsite water infiltration becomes a critical step in minimizing additional contaminated water on Site. Frac Tank use to prevent further onsite water runoff.
Prevention of ground water runoff, Disposal criteria from county to the local POTW.
|