1. Introduction
|
|
1.1 Background
|
|
|
Site Number: |
10MC |
|
Contract Number: |
|
D.O. Number: |
|
|
Action Memo Date: |
8/28/2014 |
Response Authority: |
CERCLA |
|
Response Type: |
Time-Critical |
Response Lead: |
EPA |
|
Incident Category: |
Removal Assessment |
NPL Status: |
Non NPL |
|
Operable Unit: |
|
Mobilization Date: |
10/13/2014 |
|
Start Date: |
10/13/2014 |
Demob Date: |
|
|
Completion Date: |
|
CERCLIS ID: |
WAN001002396 |
|
RCRIS ID: |
|
ERNS No.: |
|
|
State Notification: |
|
FPN#: |
|
|
Reimbursable Account #: |
|
|
2. Current Activities
|
|
2.1 Operations Section
|
|
|
2.1.1 Narrative
SWPPP controls and BMPs were inspected onsite prior to work
each day. Goldfield Mine Road was inspected visually and sampled using an XRF for contamination
daily. The road tested clean on all days. Approximately 2,500 cubic yards
(cyds) of contaminated material was removed from the mill area and placed on
the impoundment. Trees were inspected for animals and nests prior to the
removal of trees in the mill area. Approximately 4,500 cyds of contaminated
material north of Harrier Creek Road was excavated and placed on the impoundment.
Approximately 100 yards of scrap metal was hauled off-Site and sent to a
recycling facility in Coeur D’Alene, ID. The HDPE liner was sealed on
November 10th. Approximately 55 gallons of waste oil was transported
to the ACI Republic office and will be disposed of by Emerald Services at a
later date.
Sampling:
Air samples were collected from three locations on November
11th, and November 12th.
Air samples were sent for lab analysis to Pace Analytical
Services.
Anticipated Activities
for November 17th to November 21st:
Excavation of contained soils will be guided by field
screening using a field-portable X-Ray Fluorescence Meter (XRF).
|
|
2.2 Planning Section
|
|
|
2.2.1 Anticipated Activities
2.2.1.1 Planned Response Activities
2.2.1.2 Next Steps
Coordinate Site shutdown due to winter weather.
2.2.2 Issues
|
|
2.3 Logistics Section
|
|
|
No information available at this time.
|
|
2.4 Finance Section
|
|
|
No information available at this time.
|
|
2.5 Other Command Staff
|
|
|
No information available at this time.
|
3. Participating Entities
|
|
No information available at this time.
|
4. Personnel On Site
|
|
On Site Personnel:
ACI Northwest: 5 employees [4 employees on November 14th]
REMC: 1 employee
EPA: 2 employees on November 12th [Dave Rees and Monica Tonel].
START: none
Visitors/Agency
Personnel:
Nate Bittinger with Clean Harbors arrived on site to
characterize the drums located on-Site.
Chuck Gruenenfelder and Brendan Dowling with the Washington
Department of Ecology, and Cindy Marchand with the Colville Tribe arrived for a
Site visit on November 12th.
|
5. Definition of Terms
|
|
No information available at this time.
|
6. Additional sources of information
|
|
No information available at this time.
|
7. Situational Reference Materials
|
|
No information available at this time.
|