1. Introduction
|
|
1.1 Background
|
|
|
Site Number: |
V6SA |
|
Contract Number: |
|
D.O. Number: |
|
|
Action Memo Date: |
|
Response Authority: |
OPA |
|
Response Type: |
Emergency |
Response Lead: |
PRP |
|
Incident Category: |
Removal Action |
NPL Status: |
Non NPL |
|
Operable Unit: |
|
Mobilization Date: |
10/24/2016 |
|
Start Date: |
10/24/2016 |
Demob Date: |
10/27/2016 |
|
Completion Date: |
11/28/2016 |
CERCLIS ID: |
|
|
RCRIS ID: |
|
ERNS No.: |
1162329 |
|
State Notification: |
|
FPN#: |
E17602 |
|
Reimbursable Account #: |
|
1.1.1 Incident Category
Emergency Response, Oil Spill
1.1.2 Site Description
On 24 October 2016, Enterprise Products (Enterprise) notified the National Response Center (NRC) of a discharge of crude oil from a 30-inch transmission pipeline in Cushing, Lincoln County, Oklahoma. According to Enterprise representatives the break was discovered at approximately 2325 hours on 23 October 2016. An initial report to the NRC ( No. 1162329) estimated 5,000 bbl. of crude oil was discharged from the pipeline. At 0149 hours (local time), Enterprise representative reported to the NRC (No. 1162334) the estimate was revised to the worst-case discharge of 50,000 bbl. based on the total capacity of oil contained between the nearest pipeline block valves. Enterprise reports the two block valves are 13-mile apart. An early report to the NRC (No. 1162328) was made by the local county Emergency Management representative indicating an unknown volume. The spilled crude oil is an API 41.5 gravity sweet crude.
1.1.2.1 Location
The incident is located immediately adjacent to the Enterprise Cushing East Terminal along CR 3510 (aka Linwood Road) and approximately 500 feet south of CR E740 (aka Texaco Road). The 30-inch pipeline is identified as the Seaway pipeline, originating at the Cushing East Terminal and terminating at the Jones Creek Terminal near Freeport, Texas.
1.1.2.2 Description of Threat
The spillway pathway involves a portion of CR 3510
immediately south of CR E740. The oil traveled
approximately south 460 feet along the road ditch, then west and southwest for approximately 1000 feet before being contained in a 1.2 acre impoundment used as a pond for firefighting purposes on Enbridge property. The EPA Team visually
confirmed that oil had not migrated downstream of this pond. However if oil were to overflow this impoundment, another larger 3-acre fire pond
is downstream and would retain the spilled oil. An unnamed intermittent
stream is located approximately 0.6 miles downstream of the incident and Wildhorse Creek is located approximately 1.0 miles down gradient of the impacted
pond. It is estimated that based on the pond size, depth of the oil of about 18", some soil assimilation, and length of the spill path, closely to 8,800 bbls were actually spilled, which is significantly less than the earlier report of 50,000 bbls. Enterprise will eventually conduct an investigation for a more accurate spilled volume calculation.
On 1 November 2016 and
after conducting a more in-depth investigation, Enterprise updated
the spilled volume to 7,603 bbls. This volume does not include
the oil that remained within the pipeline section that was recovered by
vacuum when it continued to gravity feed and pushed towards the collection
point at the pipeline break, nor does it include the total fluids
recovered which will include water.
|
2. Current Activities
|
|
2.1 Operations Section
|
|
|
Oil recovery, road surface washing, and exposing the impacted section of the buried pipeline. Soil excavation and confirmation samples are being conducted to reach below OCC concentration limits.
2.1.1 Narrative
Enterprise initiated oil recovery during the morning
of 24 October and utilized 24-hour response operations until oil was removed from the containment pond. About 15 to 17 response crew during both day
and nights operations were actively involved in oil recovery efforts. One OSRO,
Future Environmental performed oil recovery operations and Apex
Environmental was on-scene providing air monitoring and EH&S support. Operations currently underway include excavation of impacted soils and confirmation samples. As of 10 November, no free product on the surface was visible, and efforts to remove free product near an Enbridge line 8 ft deep are being conducted.
2.1.2 Response Actions to Date
The EPA team performed air monitoring
activity at the incident scene, along the incident perimeter, and the nearest
residence over a mile away. Air
monitoring parameters utilized were O2%, LEL%, CO ppm, H2S ppm, and VOCs
ppm. VOC concentrations ranging between
26 and 48 ppm were observed during oil recovery efforts at the impacted pond. All other concentrations and locations were
observed at background concentrations or zero, respectively. Lincoln County
Emergency Management also conducted air monitoring at the facility
perimeter and the nearby community and did not detect any contaminant of
concern.
Enterprise
response activities included oil recovery from the impacted pond utilizing
vacuum trucks and a 12 frac-tank and high efficiency pump system set up to assist with the recovery operations. At the source of the spill crews were washing
the oil-affected road surface and hydro-excavating the soil around the impacted
pipeline section to expose the break and initiate the investigation as to the
cause. The remaining oil in the pipeline at the time of shut-down is also
being pumped out by vacuum trucks.
Recovered oil was re-injected into Enterprise’s Cushing East
Terminal system. Enterprise began excavating oil-affected soil for treatment and/or disposal in coordination with
the Oklahoma Corporation Commission (OCC) and the U.S. Fish & Wildlife. At of 1745 hours on 24 October, 2605 bbls of
crude oil were been recovered by the response efforts and about 8" of oil
remained within the pond. Between 25 and 27 October
2016, the response continued with removing the oil from the retention pond by
pumping, flushing the road ditch, draining the remaining oil still inside the
isolated pipeline section, and working on the soil remediation action plan with
OCC. The EPA team continued to oversee the response actions and provided advice.
The soil remediation will also include a portion of the adjacent Enbridge
property where high pressure sprayed oil was deposited on the surface during
the pipeline break.
On 28 October 2016,
Enterprise reported that 7,020 bbls of oil had been recovered.
Contractors transitioned from the Emergency Response phase to the Remediation
Phase and contractors on-site eliminated night shift operations. On 1
November 2016, Enterprise reported to EPA that the calculated volume
of oil released on-site was 7,603 bbls and the volume of oil recovered was
7,327 bbls, with a difference of 276 bbls. Impacted soils are being
excavated and will be land-farmed under guidance from the OCC if the excavated
soil meets the state's standards.
On 10 November 2016, Enterprise reported that all free product was removed from
the surface. The only free product being found is alongside an Enbridge
line that is approximately eight (8’) feet deep. This is on Enbridge’s
property directly west of the release point. There are several lines that
run across this location in a north-south direction and have slowed
progress. Enterprise reports signs of historical releases in this area
and it is expected to take the longest to remediate. Enterprise will take
another round of confirmation samples at a later date (total projected samples
will be about 100). Confirmation samples from the ditch line along CR
3510 were received and all came back below OCC criteria as described in the
2014 OCC Guidance for the Assessment and Cleanup of Crude Oil Impacted Sites.
Initial confirmation samples were pulled on Enbridge’s property and all
but two came back below the OCC. The slightly elevated levels in this area are being further excavated
and will be re-sampled.
On 15 November 2016, Enterprise provided to the EPA Team an email update and
photographic documentation of the final remediation activities being conducted
on-site. Zones were implemented to better manage operations and those that are
below OCC limits are currently being backfilled. Those that are still pending
soil analysis will be backfilled after analysis is complete. The
submitted documentation shows that all the free oil or oil stain areas that
could be a threat of a discharge have been removed and cleaned. The EPA
OSC notified Enterprise that no additional updates in relation to the response
or remediation would be needed, unless any other Federal or State agency, or
local trustee requested additional information from the EPA.
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
Based on interviews with Enterprise, DOT's Pipeline and Hazardous Materials Safety Administration (PHMSA), and the OCC, it was determined that the responsible party for the impacted pipeline is Enterprise Products as they are the owner and operator of the pipeline/facility. Enterprise uses the pipeline to also transport oil from other companies that operate terminals within the Cushing, OK area. At the time of the spill, the pipeline was transporting oil owned by Enbridge who owns and operates the terminal next to Enterprise, where the pond is located. FOSC Bernier issued a Notice of Federal Interest to Enterprise.
2.1.4 Progress Metrics
On 1 November 2016 at 1341 hours, Enterprise calculated that 7,603 bbls were released. The total volume of recovered oil is 7,327 bbls, a difference of 276 bbls, mostly from what remained inside the pipeline after the break.
As of 15 November 2016, 15,820 cubic yards of impacted soil have been removed.
Waste Stream |
Medium |
Quantity |
Manifest # |
Treatment |
Disposal |
crude oil |
liquid |
7,327 |
n/a |
|
returned |
sorbent booms/pads |
solids |
|
|
|
anticipated Oklahoma City landfill |
|
|
2.2 Planning Section
|
|
|
2.2.1 Anticipated Activities
Response
operations are anticipated to resume if any additional oil is observed
within the spill pathway or the pond, and remediation of the impacted soil
will continue until confirmation samples are below OCC limits. Another
round of confirmation samples will be conducted at a later
date. Sorbent booms/pads are currently staged in a rolloff, and they
anticipate proper disposal at the Oklahoma City Landfill. The roads have
not been opened yet due to operations.
As of 15 November 2016, 15,820 cubic yards of impacted soil have been
removed. The soil is still being staged at the Cushing West Terminal under OCC
permit 1014-X. An erosion control plan has been implemented and
backfilling will begin in appropriate zones pending soil analysis and consensus
from Enbridge.
2.2.1.1 Planned
Response Activities
Free oil recovery appeared
to be adequate and complete. Response efforts were reduced from 24-hour
operations to a day-shift basis on 28 October 2016. Impacted soil excavation
will continue until confirmation sample levels are below OCC limits.
2.2.1.2 Next Steps
Enterprise provided photo documentation of response and
remediation activities in an email update to the EPA Team to confirm completion
of response activities. Backfilling will continue in appropriate zones in
accordance with OCC guidelines. As confirmation samples are received for zones
pending analysis, backfilling will commence once concentrations are below OCC
limits
2.2.2 Issues
None at this time.
|
|
2.3 Logistics Section
|
|
|
No information available at this time.
|
|
2.4 Finance Section
|
|
|
No information available at this time.
|
|
2.5 Other Command Staff
|
|
|
No information available at this time.
|
3. Participating Entities
|
|
3.1 Unified Command
Since no significant changes to operations were expected, a basic unified command was established with only short operational briefing at shift changes to facilitate transition. Not all the cooperating agencies participated at the briefings but were kept updated of progress.
3.2 Cooperating Agencies
PHMSA, NTSB, OCC, ODEQ, Lincoln County EM and local PD/FD, and the Sac and Fox Nation Environmental Office.
|
4. Personnel On Site
|
|
During EPA response:
1 EPA
2 START
2 OCC
1 PHMSA
15 – 17 Future Environmental (OSRO)
4 – 5 APEX (RP Consultant)
> 10 Enterprise
Several Lincoln County EM Dept, Sheriff Office, and Local FD/PD.
1 Sac and Fox Nation
|
5. Definition of Terms
|
|
No information available at this time.
|
6. Additional sources of information
|
|
No information available at this time.
|
7. Situational Reference Materials
|
|
No information available at this time.
|
|
|