National Petroleum Packers

All POL/SITREP's for this site National Petroleum Packers
Stallings, NC - EPA Region IV
POLREP #12
Final POLREP
Printer Friendly  |   PDF
 
U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
National Petroleum Packers - Removal Polrep
Final Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region IV

Subject: POLREP #12
Final POLREP
National Petroleum Packers
A4QL
Stallings, NC
Latitude: 35.0847089 Longitude: -80.6782999


To:
From: Jeffery Crowley, OSC
Date: 5/9/2011
Reporting Period: 2/5/11 - 2/15/11

1. Introduction
  1.1 Background
   
Site Number: A4QL    Contract Number: EP-S4-07-04
D.O. Number: 105    Action Memo Date: 9/14/2010
Response Authority: CERCLA    Response Type: Time-Critical
Response Lead: EPA    Incident Category: Removal Action
NPL Status: Non NPL    Operable Unit:
Mobilization Date: 9/29/2010    Start Date: 9/29/2010
Demob Date: 2/15/2011    Completion Date: 2/15/2011
CERCLIS ID: NCD986232213    RCRIS ID:
ERNS No.:    State Notification: 03/12/2010
FPN#:    Reimbursable Account #:

For Site Actions that occurred prior to this reporting period and background information, please refer to previous Pollution Reports.

2. Current Activities
  2.1 Operations Section
   

The followingactivities occurred during this reporting period:

  • ERRS backfilled the east and west containment areas with clean fill and then topped that layer with layers of gravel and rock in order to provide a proper runoff area for stormwater.  In addition, a stormwater channel was placed at the back of the capped area to direct the flow of water to the stormwater ditch that runs behind the Site.
  • START demobilized their personnel and equipment from the Site 2/10/2011.
  • ERRS also completed the process of cleaning the Site and demobilizing their equipment from the Site.  Demobilization activities were completed on 2/15/2011.

The following statistics summarize the Operations at the Site:

From the Warehouse:

  • 302 55-gallon drums, 2 totes, and 228 small containers were hazcatted.
  • 509 containers from the chemical storage closet and 565 containers from the lab were hazcatted.
  • This resulted in 330 drums being removed from the warehouse.
  • In addition, 8 compressed gas cylinders and 4 pallets of diatomite and bentonite were removed.

201, 582 gallons of waste liquids and sludges were removed fromthe 26 ASTs at the Site.

1,775 tons of tank bottoms and sludges were solidified usingcotton trash.

14,400 pounds of aluminum, 7,530 tons of stainless steel, and106.3 tons of steel from the ASTs were recycled.

Demolition at the Site included 26 ASTs, the glycol recyclingprocessor, 4 tanker trucks and one tractor trailer.

  2.2 Planning Section
    2.2.1 Anticipated Activities

    2.2.1.1 Planned Response Activities
No further activities are planned by ERRB at this Site, however, the Site has been referred to SRSEB for evaluation of any potential groundwater contamination from the operations at the Site.

   






  2.3 Logistics Section
    At this time, this Site poses no logistical issues.

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    No information available at this time.

3. Participating Entities
  No information available at this time.

4. Personnel On Site
  No information available at this time.

5. Definition of Terms
  AST - Above Ground Storage Tank
BTU - British Thermal Unit
CI - Civil Investigator
EPA - Environmental Protection Agency
EPM - Enforcement Project Manager
ERRB - Emergency Response and Removal Branch
ERRS - Emergency and Rapid Response Services
NFPA - National Fire Protection Association
NPP - National Petroleum Packers
OSC - On Scene Coordinator
PCB - Polychlorinated biphenyl
PPE - Personal Protective Equipment
PRP - Potentially Responsible Party
RAL - Removal Action Level
RSL - Removal Screening Level
RFQ - Request For Quote
SRSEB - Superfund Remedial Site Evaluation Branch
START - Superfund Technical Assessment and Response Team
SVOC - Semi-Volatile Organic Compound
TCE - Trichloroethylene
VOC - Volatile Organic Compound


6. Additional sources of information
  No information available at this time.

7. Situational Reference Materials
  No information available at this time.


Click here to view Attached Images