Portage Creek Area

All POL/SITREP's for this site Portage Creek Area
Kalamazoo, MI - EPA Region V
POLREP #30
Progress
Printer Friendly  |   PDF
 
U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Portage Creek Area - Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region V

Subject: POLREP #30
Progress
Portage Creek Area
059B05
Kalamazoo, MI
Latitude: 42.2839750 Longitude: -85.5791570


To: Mark Mills, Michigan DNR
Daria Devantier, MDEQ
Debbie Jung, City of Kalamazoo
Lisa Williams, U.S. FWS
Todd Goeks, NOAA
Valincia Darby, Department of Interior

From: Craig Thomas, On-Scene Coordinator
Date: 7/8/2013
Reporting Period: 6/22/2013 - 7/08/2013

1. Introduction
  1.1 Background
   
Site Number: 059B05    Contract Number: EP-S5-08-02
D.O. Number: 0087    Action Memo Date: 7/5/2011
Response Authority: CERCLA    Response Type: Time-Critical
Response Lead: EPA    Incident Category: Removal Action
NPL Status: NPL    Operable Unit: 05
Mobilization Date: 9/26/2011    Start Date: 8/30/2011
Demob Date:      Completion Date:  
CERCLIS ID: MID006007306    RCRIS ID: NA
ERNS No.:    State Notification: Yes
FPN#:    Reimbursable Account #:

1.1.1 Incident Category
Fund-lead removal action

1.1.2 Site Description
See POLREP #1

1.1.2.1 Location
See POLREP #1

1.1.2.2 Description of Threat
See POLREP #1

1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
See POLREP #1

2. Current Activities
  2.1 Operations Section
    2.1.1 Narrative
All equipment, materials and supplies were demobilized from SA3A to SA1C & SA1B.  Preparations continued for contaminated sediment removal operations in SA1C & SA1B, which are expected to begin the week of July 15.

2.1.2 Response Actions to Date
From June 22 to July 8, EPA and ERRS contractors conducted the following activities:

Site Activities - John Street Staging Area
- Treated 33,026 gallons of potentially contaminated contact water in EPA's mobile wastewater treatment plant, for a total of 970,587 gallons treated to date.

Site Activities - SA3A
- Removed all remaining equipment, supplies and materials from area;
- Removed access roadways and performed limited site grading in preparation for restoration activities; and
- Conducted work area perimeter air monitoring for dust.

Site Activities - SA1B&C
- Mobilized all equipment, supplies and materials to staging areas;
- Completed construction of creekwater bypass pumping system; and
- Completed construction of isolation de-watering (ground water extraction) system.

Project Management Activities
- Continued weekly progress meetings with City of Kalamazoo, including property owners upon request;
- Finalized area specific restoration plan and implementation agreement for SA3A in coordination with property owners;
- Obtained additional access agreements for properties in SA1A & SA1B;
- Solicited bids for clearing and grubbing activities in SA1A & SA1B; and
- Completed Technical Memo for dredging operations in SA1B & SA1C (posted to document section of website).

2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
See POLREP #1

2.1.4 Progress Metrics
 
Waste Stream Medium Quantity Manifest # Treatment Disposal
TSCA contaminated
sediments
solidified sediment  none    disposal  Wayne Disposal,
Belleville, MI 
Non-TSCA
contaminated
sediments 
solidified sediment  none disposal C&C Landfill,
Marshall, MI
Scrap Metal steel 4440 lbs  n/a recycling Schupan Industrial Recycling,
Kalamazoo, MI
Plastic empty bottles 40 lbs  n/a recycling Best Way Disposal, Inc.
Drop-off Center
Kalamazoo, MI

 

  2.2 Planning Section
    A summary of removal activities that are anticipated to take place from July 9 to July 19 include:
 
Site Activities - John Street Staging Area
- Continue treatment of contact water from the staging pad sump with mobile wastewater treatment plant;
- Receive contaminated sediment removed from SA1C; and
- Conduct work area perimeter air monitoring for dust.

Site Activities - SA3A
- Conduct post-construction soil sampling in all work / staging areas.

Site Activities - SA1B & SA1C
- Complete installation of sheet pile coffer dams to isolate excavation area;
- Start-up creekwater bypass and isolation dewatering (ground water extraction) pump systems;
- Finalize preparations for contaminated sediment removal operations;
- Begin receiving and stockpiling of aggregates for creek channel backfill;
- Commence excavation of contaminated sediments from grids SA1C-1 & SA1C-2; and
- Conduct work area perimeter air monitoring for dust.

Project Management Activities

- Continue weekly progress meetings with City of Kalamazoo, including property owners upon request;
- Continue development of area specific restoration plans for SA1B, SA1C & SA1A;
- Begin development of Technical Memo for dredging operations in SA1A;
- Coordinate with Kalamazoo County & Kalamazoo Sunrise Rotary regarding planned work activities in Veteran's Park to support anticipated SA1A removal operations;
- Obtain approval of area specific restoration plan for SA5A and begin restoration work (planting) if possible; and
- Obtain consent to access from remaining property owner in SA1A.

2.2.1 Anticipated Activities
See POLREP #2

2.2.1.1 Planned Response Activities
See above

2.2.1.2 Next Steps
See above

2.2.2 Issues
Initially, the overall schedule contemplated excavation of contaminated sediments in SA1A (Portage Creek confluence with Kalamazoo River) during the 2014 construction season.  However, if weather conditions remain favorable and other potentially mitigating factors are resolved, excavation of SA1A will be completed in the 2013 construction season.

  2.3 Logistics Section
   

The current resources present on site during this reporting period include:

- Office trailers
- Portable restrooms & hand-washing stations
- Portable generators
- Submersible pumps
- Equipment storage container
- ERRS work crews and subcontractor work crews
- START sampling contractor
- Security subcontractor personnel
- Heavy equipment
- Water truck
- Street sweeper
- Mixing box
- Frac (water) tanks
- Pressure wash trailer
- Bypass pumps & piping
- Sheet piling
- Mobile wastewater treatment plant

- Monitoring Equipment
- Traffic control structures & roadway signage
- Mobile light towers


  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    2.5.1 Safety Officer

Craig Thomas, Paul Ruesch and Andrew Maguire serve as safety officer(s). The HASP is reviewed and signed by all site personnel. All new personnel, including sub-contractors, are provided a site orientation and safety briefing. Safety meetings are held each morning with all site workers.

2.6 Liaison Officer
Craig Thomas, Paul Ruesch and Andrew Maguire serve as liaison(s) with local officials and interested parties. 

A tour of the SA1-C excavation area was provided to approximately 20 students and professors from Grand Valley State University and Western Michigan University on July 8. 

2.7 Information Officer
See Section 2.6

2.7.1 Public Information Officer
See Section 2.6

2.7.2 Community Involvement Coordinator
Don DeBlasio - U.S. EPA


3. Participating Entities
  3.1 Unified Command
N/A

3.2 Cooperating Agencies

U.S. Environmental Protection Agency

Michigan Department of Environmental Quality
Michigan Department of Agriculture and Rural Development

Michigan Department of Natural Resources

U.S. Fish and Wildlife Service

City of Kalamazoo:

            Department of Public Services
            Parks and Recreation Department
            Economic Development Department
            Community Planning & Development
            Public Safety Department
            Fire Department
            Police Department
            Redevelopment Department
Bronson Methodist Hospital

Kalamazoo Nature Center


4. Personnel On Site
 

U.S. EPA - 2
START contractor (Weston Solutions) - 1
ERRS contractor (Environmental Quality Management, Inc) - 11
Baker Pumps - 2
Fulton Trucking - 2
Matt's Underground Utility Construction - 5 

TOTAL PERSONNEL = 23


5. Definition of Terms
  C&D - Construction and Demolition (waste)
ERRS - Emergency and Rapid Response Services
FOSC - Federal On Scene Coordinator
U.S. FWS - United States Fish and Wildlife Service
HASP - Health and Safety Plan
mg/kg - milligrams per kilogram
mg/m3 - milligrams per cubic meter
MDARD - Michigan Department of Agriculture and Rural Development
MDEQ - Michigan Department of Environmental Quality
NA - Not Applicable
NOAA - National Oceanic and Atmospheric Administration
NPL - National Priorities List
NRDA - Natural Resource Damage Assessment
PCB - polychlorinated biphenyl
ppm - parts per million
PRPs - Potentially Responsible Parties
RTK GPS - Real Time Kinematic Global Positioning System
SA - Slope Area
START - Superfund Technical Assessment and Response Team
U.S. EPA - United States Environmental Protection Agency

6. Additional sources of information
  6.1 Internet location of additional information/report

See the project website at http://www.epaosc.org/portagecreekarea.


6.2 Reporting Schedule
The next POLREP will be generated on July 19.

7. Situational Reference Materials
 

See the project website at http://www.epaosc.org/portagecreekarea

Additional information on the overall Kalamazoo River Project can be found at http://www.epa.gov/Region5/cleanup/kalproject/index.htm.



Click here to view Attached Images