1. Introduction
|
|
1.1 Background
|
|
|
Site Number: |
059B05 |
|
Contract Number: |
EP-S5-08-02 |
D.O. Number: |
0087 |
|
Action Memo Date: |
7/5/2011 |
Response Authority: |
CERCLA |
|
Response Type: |
Time-Critical |
Response Lead: |
EPA |
|
Incident Category: |
Removal Action |
NPL Status: |
NPL |
|
Operable Unit: |
05 |
Mobilization Date: |
9/26/2011 |
|
Start Date: |
8/30/2011 |
Demob Date: |
|
|
Completion Date: |
|
CERCLIS ID: |
MID006007306 |
|
RCRIS ID: |
NA |
ERNS No.: |
|
|
State Notification: |
Yes |
FPN#: |
|
|
Reimbursable Account #: |
|
1.1.1 Incident Category
Fund-lead removal action
1.1.2 Site Description
See POLREP #1
1.1.2.1 Location
See POLREP #1
1.1.2.2 Description of Threat
See POLREP #1
1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
See POLREP #1
|
2. Current Activities
|
|
2.1 Operations Section
|
|
|
2.1.1 Narrative
Extreme cold and heavy snow conditions prevented field activity during the reporting period. Planning for remaining restoration work in the 2014 construction season and development of the final project report continued.
2.1.2 Response Actions to Date
From December 21, 2013 to March 28, 2014, EPA, START and ERRS contractors conducted the following activities:
Project Management Activities
- Met with individual property owners affected by project to discuss and obtain signatures on close-out document;
- Met with restoration sub-contractor to discuss replacement of impacted 2012 restoration plantings and outstanding restoration planting / grading work in SA1A;
- Met with property owner at entrance to SA1C to plan additional restoration work on impacted asphalt;
- Planned additional post-construction sampling at John Street Staging Area and SA1A staging area;
- Planned additional restoration activities in SA1A staging area; and
- Continued review and development of project final report (full draft developed).
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
See POLREP #1
2.1.4 Progress Metrics
NA
|
|
2.2 Planning Section
|
|
|
Removal activities anticipated to take place this Spring (as weather permits) include the following:
Site Activities - SA1A&B
- Conduct additional soil removal/grading activities in SA1A work area as needed;
- Apply seed/fertilizer mixture in areas around restoration plantings and concrete/asphalt repairs;
- Install erosion control blanket in areas where soil removal/grading/seed is applied;
- Remove silt fence along creek banks; and
- Conduct additional restoration plantings as requested by property owner(s).
Site Activities - SA1C
- Complete additional asphalt repairs at entrance off 536 E. Michigan Avenue.
Project Management Activities
- Replace impacted 2012 restoration plantings; and
- Continue review and development of project final report.
2.2.1 Anticipated Activities
See POLREP #2
2.2.1.1 Planned Response Activities
See above
2.2.1.2 Next Steps
See above
2.2.2 Issues
None
|
|
2.3 Logistics Section
|
|
|
There were no resources present on site during this reporting period.
|
|
2.4 Finance Section
|
|
|
No information available at this time.
|
|
2.5 Other Command Staff
|
|
|
2.5.1 Safety Officer
Craig Thomas serves as safety officer.
2.6 Liaison Officer
Craig Thomas serves as liaison with local officials and interested parties.
2.7 Information Officer
See Section 2.6
2.7.1 Public Information Officer
See Section 2.6
2.7.2 Community Involvement Coordinator
Don DeBlasio and Patti Krause - U.S. EPA
|
3. Participating Entities
|
|
3.1 Unified Command
N/A
3.2 Cooperating Agencies
U.S. Environmental Protection Agency
Michigan Department of Environmental Quality
Michigan Department of Agriculture and Rural Development
Michigan Department of Natural Resources
U.S. Fish and Wildlife Service
City of Kalamazoo:
Department of Public Services
Parks and Recreation Department
Economic Development Department
Community Planning & Development
Public Safety Department
Fire Department
Police Department
Redevelopment Department
Bronson Methodist Hospital
Kalamazoo Nature Center
|
4. Personnel On Site
|
|
U.S. EPA - 2
ERRS contractor (Environmental Quality Management, Inc) - 1
TOTAL PERSONNEL = 3 (during site visits only)
|
5. Definition of Terms
|
|
ERRS - Emergency and Rapid Response Services
FOSC - Federal On Scene Coordinator
HASP - Health and Safety Plan
mg/kg - milligrams per kilogram
mg/m3 - milligrams per cubic meter
MDEQ - Michigan Department of Environmental Quality
PCB - polychlorinated biphenyl
ppm - parts per million
SA - Slope Area
START - Superfund Technical Assessment and Response Team
U.S. EPA - United States Environmental Protection Agency
|
6. Additional sources of information
|
|
6.1 Internet location of additional information/report
See the project website at http://www.epaosc.org/portagecreekarea.
6.2 Reporting Schedule
The next POLREP will be generated as needed dependent on field activity.
|
7. Situational Reference Materials
|
|
See the project website at http://www.epaosc.org/portagecreekarea.
Additional information on the overall Kalamazoo River Project can be found at http://www.epa.gov/Region5/cleanup/kalproject/index.htm.
|