U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Oak Creek Bluff

All POL/SITREP's for this site Oak Creek Bluff
Oak Creek, WI - EPA Region V
POLREP #4
Final
Printer Friendly  |   PDF
 
U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Oak Creek Bluff - Removal Polrep
Final Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region V

Subject: POLREP #4
Final
Oak Creek Bluff
C598
Oak Creek, WI
Latitude: 42.8430002 Longitude: -87.8534858


To: Jason El-Zein, US EPA
Durno Mark, US EPA
Mike Ribordy, US EPA
Scott Ferguson, WDNR
Roxanne Chronert, WDNR
David Lee, WE Energies
Sherry Fielding, U.S. EPA
John Glover, U.S. EPA
Carol Ropski, U.S. EPA R5
Henry Nehls-Lowe, WDHS
Mick Hans, U.S. EPA
Sarah Warner, US Fish & Wildlife Service
Richard Clarizio, USEPA R5
Lindy Nelson, U.S. DOI
Sam Borries, U.S. EPA
Yolanda Bouchee-Cureton, U.S. EPA
Thomas Marks, U.S. EPA
Joe Ulfig, U.S. EPA
USCG PolRep Distribution, USCG
Andrew Savagian, WDNR
Ashley Wiertzema, Wisconsin Division of Public Health
Laurie Ross, Wisconsin Natural Resources Board
Dave Dixon, USCG

From: Kathy Halbur, OSC
Date: 11/29/2012
Reporting Period: 11/22/2011-11/28/2012

1. Introduction
  1.1 Background
   
Site Number: C598    Contract Number:  
D.O. Number:      Action Memo Date:  
Response Authority: CERCLA/OPA    Response Type: Emergency
Response Lead: PRP    Incident Category: Removal Action
NPL Status: Non NPL    Operable Unit:
Mobilization Date: 11/1/2011    Start Date: 10/31/2011
Demob Date: 2/3/2012    Completion Date: 11/28/2012
CERCLIS ID:    RCRIS ID:
ERNS No.:    State Notification:
FPN#: G12002    Reimbursable Account #:

1.1.1 Incident Category

EPA Region 5 supported a U.S. Coast Guard (USCG) and State (Wisconsin DNR) lead emergency response to a bluff failure that resulted in a release of hazardous substances, including petroleum products, to Lake Michigan.  We Energies assumed responsibility for the emergency removal action. 

1.1.2 Site Description

At approximately 11:00 am on October 31, 2011, a lakefront bluff along Lake Michigan gave way, releasing a variety of construction materials, soil, and fly-ash into Lake Michigan.  These materials included native soils, flyash, sea/land containers, road vehicles, construction vehicles, and fuel containers.

1.1.2.1 Location

The bluff collapse occurred at WE Energies Oak Creek Power Plant, 11060 S. Chicago Rd., Oak Creek (Milwaukee County), WI.

1.1.2.2 Description of Threat

Hazardous substances (including heavy metals) and petroleum products were submerged in Lake Michigan as a result of the bluff collapse.  The potential for petroleum discharged as a result of this incident was determined to be between 600-1,000 gallons.  All large equipment was removed from Lake Michigan by November 21, 2011. Additional smaller equipment was removed from the lakebed by December 5, 2011. The only observable sheening was during day one of the incident.

1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results

EPA collected and analyzed a sample of the soil/flyash material from the base of the landslide.  Elevated levels of arsenic, chromium, and 1,1,1 Trichloroethane were detected.  EPA also collected four water samples from Lake Michigan.  Elevated suspended and dissolved solids were identified near the spill area.  A composite sample of excavated material from the base of the bluff and east settling pond was also collected by EPA; analytical results of this sample were consistent with the initial soil/flyash sample.  WDNR and We Energies collected similar samples; those results were similar to the EPA results.

2. Current Activities
  2.1 Operations Section
    2.1.1 Response Actions to Date

We Energies assumed responsibility for all cleanup work. Contractors and consultants (Clean Harbors, Gillen, Edgerton, URS, Brandenburg, and Natural Resources Technology) were immediately mobilized to the scene.  See previous POLREPs for details regarding response actions taken to stop additional releases, stabilize the bluff, remove recoverable materials from Lake Michigan, clean the shoreline and settling ponds, verify the cleanup, and restore the bluff. 

The following occurred during this reporting period:
  • We Energies submitted an Interim Spill Report on December 14, 2011
  • We Energies and EPA conducted a shoreline impact study in December, 2011 that determined no further action was needed on downstream shorelines; We Energies submitted a shoreline assessment report on January 18, 2012
  • We Energies submitted a report detailing results of sediment and water sampling on January 27, 2012
  • Unified Command held its final meeting and disbanded on February 3, 2012
  • WDNR initiated enforcement against We Energies in March, 2012
  • We Energies submitted the permanent bluff restoration plan to WDNR on June 29, 2012
  • We Energies obtained required permits and approvals for restoration work through the summer and fall of 2012 and conducted restoration work
  • UWM conducted hydrodynamic modelling for the coal ash release to confirm that the sampling conducted to date was in the appropriate locations; UWM's report was completed in September, 2012
  • We Energies submitted the Final Spill Report on November 19, 2012
  • We Energies submitted answers to EPA OSC questions regarding Final Spill Report on November 28, 2012

2.2.1. Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)

WE Energies has taken responsibility for this incident.  USCG issued Notices of Federal Interest to WE Energies (as the facility/property owner), URS (as an operator), and Metropolitan Environmental (as an operator).  WDNR initiated formal enforcement against We Energies for this incident in March, 2012.

2.1.3 Progress Metrics

Waste Stream Medium Quantity Manifest Treatment Disposal
Oily Debris Material from Lake Michigan Solid  61.15 Tons Multiple Landfill  Waste Management Metro Landfill, Franklin, WI
Debris from Shore/South Yard Area Solid 357.4 Tons Multiple Landfill Waste Management Metro Landfill, Franklin, WI
Coal ash Solid 22,506 Cubic Yards NA Landfill We Energies Caledonia Ash Landfill
Coal ash/Soil Mix Solid 4,200 Cubic Yards NA Landfill Emerald Park Landfill
Scrap Metal Solid 25.28 Tons NA Recycled Miller Compressing, Milwaukee, WI
Oily Water Liquid 3250 Gallons 43959 Disposal Jensen Environmental Management, Muskego, WI


  2.2 Planning Section
    2.2.1 Anticipated Activities

No additional activities are anticipated or planned.  This is EPA's Final POLREP.


  2.3 Logistics Section
    No logisitics issues during this reporting period.

  2.4 Finance Section
    We Energies is the Responsible Party for this incident.  We Energies estimates clean-up and restoration costs associated with this incident to be $12.1 million.


   
Estimated Costs *
  Budgeted Total To Date Remaining % Remaining
Extramural Costs
START $30,000.00 $17,500.00 $12,500.00 41.67%
Intramural Costs
 
Total Site Costs $30,000.00 $17,500.00 $12,500.00 41.67%

* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.


  2.5 Other Command Staff
    2.5.1 Safety Officer

We Energies acted as the Safety Officer for this response. 

2.5.2 Information Officer

Unified Command, including the joint information group, disbanded on February 3, 2012. 

3. Participating Entities
  3.1 Unified Command

A Unified Command (UC) was established on November 5, 2011.  WE Energies, USCG, and WDNR were voting members of the UC; EPA was a non-voting member of the UC.  USFWS also participated in the Unified Command/Planning Meetings.  UC disbanded on February 3, 2012.

3.2 Cooperating Agencies

WI Department of Health Services (WDHS)
WI Public Service Commission (WPSC)
National Oceanic and Atmospheric Administration (NOAA)
U.S. Fish & Wildlife Service (USFWS)
Occupational Safety & Health Administration (OSHA)

4. Personnel On Site
  EPA OSC Halbur acted as the EPA representative on the Unified Command and a Deputy Operations Section Chief for this response.


5. Definition of Terms
  CERCLA: Comprehensive Environmental Response, Compensation, and Liability Act
OPA:  Oil Pollution Act
OSC:  On-Scene Coordinator
UC: Unified Command
USCG:  United States Coast Guard
U.S. EPA:  United States Environmental Protection Agency
UWM: University of Wisonsin Milwaukee
WDNR:  Wisconsin Department of Natural Resources

6. Additional sources of information
  6.1 Internet location of additional information/report

www.epaosc.org/WE_oak_creek

6.2 Reporting Schedule

This is the Final POLREP.

7. Situational Reference Materials
 
 R5 Priorities Summary
This is an Integrated River Assessment.  The numbers should overlap. Miles of river systems cleaned and/or restored 0
Cubic yards of contaminated sediments removed and/or capped 0
Gallons of oil/water recovered  0
Acres of soil/sediment cleaned up in floodplains and riverbanks  0
Stand Alone Assessment Acres Protected  1
Number of contaminated residential yards cleaned up  0
Human Health Exposures Avoided  0
Number of workers on site  272
Contaminant(s) of Concern
Contaminant(s) of Concern Coal ash, petroleum products, metals