U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Sunoco Pipeline Wellington Ohio - Removal Polrep

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region V
|
|
Subject:
|
POLREP #4
Sunoco Pipeline Wellington Ohio
Wellington, OH
Latitude: 41.1792677 Longitude: -82.2159290
|
|
To:
|
Mark Durno, U.S. EPA
Jason El-Zein, U.S. EPA
Sherry Fielding, U.S. EPA
USCG Fund Center, USCG
Valencia Darby, Department of Interior
Freddie Thompson, NPFC
Isalee Coleman, EPA
Mark Johnson, ATSDR
Andrew Raddant, Department of Interior
Scott Shane, Ohio EPA
Carol Ropski, U.S. EPA
USCG PolRep Distribution, USCG
Kurt Kollar, OEPA - Northeast District
Officer Duty, USCG
Richard Clarizio, U.S. EPA
|
|
From:
|
Joe Fredle, On-Scene Coordinator
|
|
Date:
|
2/27/2012
|
|
Reporting Period:
|
1/24/12 - 2/24/12
|
|
1. Introduction
|
|
|
1.1 Background
|
|
|
|
|
Site Number: |
|
|
Contract Number: |
|
|
D.O. Number: |
|
|
Action Memo Date: |
|
|
Response Authority: |
OPA |
|
Response Type: |
Emergency |
|
Response Lead: |
EPA |
|
Incident Category: |
Removal Assessment |
|
NPL Status: |
Non NPL |
|
Operable Unit: |
|
|
Mobilization Date: |
1/13/2012 |
|
Start Date: |
1/13/2012 |
|
Demob Date: |
|
|
Completion Date: |
|
|
CERCLIS ID: |
|
|
RCRIS ID: |
|
|
ERNS No.: |
|
|
State Notification: |
|
|
FPN#: |
E12508 |
|
Reimbursable Account #: |
|
see polrep 1
|
|
2. Current Activities
|
|
|
2.1 Operations Section
|
|
|
|
Response Actions to Date
Air
As of 1/22 the USEPA halted their air monitoring support activities, SUNOCO continued until 2/21.
White Ditch
There is no longer a visible sheen in the stream during undisturbed conditions.
Aeration activities have been halted in the stream.
All containment dams in the stream have been removed along with any contaminated soil in the vicinity of those dams. A new under flow dam has been constructed at Peck Rd. as a precaution.
Zone 1
All grossly contaminated soils have been excavated and disposed of off site.
The pipeline has been repaired and put back in use.
Progress Metrics
| Waste Stream |
Medium |
Quantity |
Manifest # |
Treatment |
Disposal |
| recovered gasoline |
liquid |
30,510 gal. |
|
recycle |
|
| recovered water contaminated with disolved organics |
liquid |
456,142 gal. |
|
onsite and offsite |
|
| gasoline contaminated soil |
solid |
8664 cubic yards |
|
|
landfill or incineration |
|
|
|
2.2 Planning Section
|
|
|
|
Evaluation of stream sediment is ongoing.
Evaluation of residual soil contamination is ongoing.
|
|
|
2.3 Logistics Section
|
|
|
|
No information available at this time.
|
|
|
2.4 Finance Section
|
|
|
|
|
|
|
|
| |
Budgeted |
Total To Date |
Remaining |
% Remaining |
|
Extramural Costs
|
| |
$140,000.00 |
$135,000.00 |
$5,000.00 |
3.57% |
|
Intramural Costs
|
| |
| Total Site Costs |
$140,000.00 |
$135,000.00 |
$5,000.00 |
3.57% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.
|
|
|
2.5 Other Command Staff
|
|
|
|
No information available at this time.
|
|
3. Participating Entities
|
|
|
No information available at this time.
|
|
4. Personnel On Site
|
|
|
No information available at this time.
|
|
5. Definition of Terms
|
|
|
No information available at this time.
|
|
6. Additional sources of information
|
|
|
No information available at this time.
|
|
7. Situational Reference Materials
|
|
|
No information available at this time.
|
|
POLREP #4 Last Updated 6/7/2012
|
|
|