Tamarack Stamp Mill

All POL/SITREP's for this site Tamarack Stamp Mill
Tamarack City, MI - EPA Region V
POLREP #2
Fund Lead Removal Complete. Final POLREP
Printer Friendly  |   PDF
 
U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Tamarack Stamp Mill - Removal Polrep
Final Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region V

Subject: POLREP #2
Fund Lead Removal Complete. Final POLREP
Tamarack Stamp Mill
C5V3
Tamarack City, MI
Latitude: 47.1685970 Longitude: -88.4350100


To:
From: Brian Kelly, OSC
Date: 8/14/2014
Reporting Period:

1. Introduction
  1.1 Background
   
Site Number: C5V3    Contract Number:  
D.O. Number:      Action Memo Date: 5/19/2014
Response Authority: CERCLA    Response Type: Time-Critical
Response Lead: EPA    Incident Category: Removal Action
NPL Status: Non NPL    Operable Unit:
Mobilization Date: 7/28/2014    Start Date: 7/28/2014
Demob Date: 8/14/2014    Completion Date: 8/14/2014
CERCLIS ID: MIN000510933    RCRIS ID:
ERNS No.:    State Notification: Yes
FPN#:    Reimbursable Account #:

Incident Category
CERCLA Time- Critical Fund Lead Removal Action

Site Description and Location
The vacant Tamarack Stamp Mill Site (TSM Site) is located in Tamarack City, Osceola Township, Houghton County, Michigan 49934. The TSM Site is a former stamp mill that has been abandoned since at least 1978. The main mill building was torn down in 1975, and remaining concrete structures were subsequently dynamited for demolition and scrapping circa 1978 - 1983. Samples collected from historically significant debris piles (HSDP) at the site contained as high as 15% Chrysotile asbestos. The HSDPs containing asbestos were outdoors and within 100 feet of the Tamarack City Park.


Description of Threat and Preliminary Removal Assessment Results

On May 21, 2013, the Michigan Department of Environmental Quality (MDEQ) collected three samples at the TSM Site. All three sample results showed asbestos. On June 6, 2013, MDEQ requested EPA assistance in addressing asbestos at the TSM Site. The site is described in the referral as unrestricted and next to a playground. On August 5 and September 10, 2013, EPA conducted a site assessment. Samples collected by EPA showed 6 of 12 sample locations at the TSM Site contained 5-15% Chrysotile asbestos. The assessment confirmed that the site was unrestricted, and that asbestos debris was outdoors and in close proximity to a public park.

2. Current Activities
  2.1 Operations Section
    Response Actions to Date
On July 16, 2014, EPA, MDEQ, the Osceola Township Supervisor, and the National Park Service (NPS) met on site to discuss the planned removal. EPA was seeking recommendations from NPS on preservation of the historic nature of the site.

On July 28, 2014, EPA, ERRS, and START mobilized to being the cleanup. The planned removal included 1) Development and implementation of a site health and safety plan; 2) Working with NPS on preservation of historical artifacts to the extent practicable;3) Developing and implementing a work plan to remove for offsite disposal and covering debris; 3) Limiting public access to the site during the removal; 4) Conducting air monitoring during the cleanup; and 4) Disposing of hazardous substances at a properly regulated facility.

Work was completed on the site on August 14, 2014. No personal or perimeter air samples exceeded the air monitoring plan action levels. During the work several historic artifacts including milling balls, tools, and drill bits were found. These items were transferred to the NPS for preservation.

Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
See enforcement addendum to the action memo.

2.1.4 Progress Metrics

Regional Metrics
This is an Integrated River Assessment.  The numbers should overlap. Miles of river systems cleaned and/or restored 0
Cubic yards of contaminated sediments removed and/or capped 0
Gallons of oil/water recovered 0
Acres of soil/sediment cleaned up in floodplains and riverbanks 0
Stand Alone Assessment Number of contaminated residential yards cleaned up 0
Number of workers on site 8
Contaminant(s) of Concern Asbestos
Oil response Tracking
Estimated volume  Initial amount released N/A
Final amount collected N/A
CANAPS Info FPN Ceiling Amount N/A
FPN Number N/A
Body of Water affected N/A
Administrative and Logistical Factors (Check X where applicable)
X Precedent-Setting HQ Consultations (e.g., fracking, asbestos)  o Community challenges or high involvement o Radiological
o More than one PRP o Endangered Species Act  / Essential Fish Habitat issues o Explosives
o AOC o Historic preservation issues o Residential impacts
o UAO o NPL site o Relocation
o DOJ involved o Remote location o Drinking water impacted
o Criminal Investigation Division involved o Extreme weather or abnormal field season o Environmental justice
o Tribal consultation or coordination or other issues o Congressional involvement o High media interest
o Statutory Exemption for $2 Million o Statutory Exemption for 1 Year o Active fire present
x Hazmat Entry Conducted – Level A, B or C o Incident or Unified Command established o Actual air release (not threatened)



Waste Stream Medium Quantity Treatment Disposal
 asbestos and ACM  
soild 4y3
 Landfill  K & W Landfill Inc
11877 State Highway M38,
Ontonagon, MI 49953
         
         


  2.2 Planning Section
    Planned Response Activities and Next Steps
None. Removal Complete

Next Steps
Close out site

Issues
None. Coordination with NPS, State, and Local government was successful.

  2.3 Logistics Section
    No information available at this time.

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    No information available at this time.

3. Participating Entities
  No information available at this time.

4. Personnel On Site
  No information available at this time.

5. Definition of Terms
  No information available at this time.

6. Additional sources of information
  No information available at this time.

7. Situational Reference Materials
  No information available at this time.


Click here to view Attached Images