Little City Building

All POL/SITREP's for this site Little City Building
Ottawa, IL - EPA Region V
POLREP #4
Final
Printer Friendly  |   PDF
 
U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Little City Building - Removal Polrep
Final Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region V

Subject: POLREP #4
Final
Little City Building

Ottawa, IL
Latitude: 41.3468652 Longitude: -88.8420776


To: Reginald Pallesen, ORC
Deena Sheppard, Enf. SP
David Noble, City Engineer

From: Bradley Benning, OSC
Date: 9/9/2015
Reporting Period: 08/21/2015 to 09/09/2015

1. Introduction
  1.1 Background
   
Site Number: C55U    Contract Number: EP-S5-08-02
D.O. Number: 0156    Action Memo Date: 5/19/2015
Response Authority: CERCLA    Response Type: Time-Critical
Response Lead: EPA    Incident Category: Removal Action
NPL Status: Non NPL    Operable Unit:
Mobilization Date: 7/27/2015    Start Date: 7/27/2015
Demob Date: 9/9/2015    Completion Date: 9/9/2015
CERCLIS ID: ILN000505583    RCRIS ID:
ERNS No.:    State Notification:
FPN#:    Reimbursable Account #:

1.1.1 Incident Category

Time-Critical Removal Action


1.1.2 Site Description

The Little City Building Site’s (LCB) owner of over ten years, attempted to clean up the building for possible redevelopment and/or sale.  The contractor hired by the owner in fact gutted the building for scrap causing flooding, severe structural problems and the release of ACM throughout the building.  Future attempts to sell the site were unsuccessful due to the ACM release and structural concerns.  The owner offered to donate the building to the City of Ottawa, as they no longer had financial resources to address the deteriorating conditions in the building.  The City of Ottawa hired consultants to conduct asbestos and structural surveys of the building in 2014, which confirmed ACM release and imminent structural concerns.  The City of Ottawa requested assistance from EPA due to the escalating costs for ACM cleanup, structural repairs and /or demolition of the site.  EPA conducted an assessment of the building and found additional structural damage, giving concern that partial or complete structural failure of the building is imminent.  The Site was referred to the Region 5 Superfund Program through the Brownfield’s Program.

The Site comprises approximately 34,200 square feet, is a five story multi-wythe brick wall and timber floor framed structure constructed in 1902. The building’s exterior west wall shows significant signs of failure due to years of water damage.  Several windows are now open as past board-up measures have failed.  A large area of the roof has collapsed resulting in the pancaking of floor sections on all five stories of the building.  Extreme damage to all interior rooms is apparent from many years of neglect and water damage.  The City has placed barriers along the south and west perimeters to keep pedestrians clear of the building. 

 

1.1.2.1 Location

The Site is located at 112 West Madison Street, Ottawa, LaSalle County, Illinois. The building abuts existing structures to the east with a small alley to the west.  A parking lot is situated to the north and the south face is the original main entrance along Madison Street sidewalk.  The building is in the downtown business district. The Site’s geographical coordinates are 41.3468 North latitude and -88.8420 West longitude.     



1.1.2.2 Description of Threat

The Site presents a threatened and an ongoing release of hazardous substances.  Past actions to secure the building show evidence of failing, several windows are now open as board-up measures have failed and the roof is partially exposed, posing potential release of ACM to the environment.  This building is severely damaged and contains friable ACM throughout the inside which would pose an imminent and substantial threat to public health should the building suffer a catastrophic failure.


1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results

The removal site evaluation utilized data from the Comprehensive NESHAP Asbestos Survey conducted January of 2014, by Midwest Environmental Consulting Services and Building Structural Survey conducted August 2014, by Fehr-Graham Engineering for the City of Ottawa, which documented the following site conditions.

 

A total of 25 homogeneous areas were sampled, with 12 areas testing positive for asbestos (Chrysotile 1-20%), and one area (boiler insulation) not sampled due to site conditions but assumed to be asbestos.  The ACM included air cell pipe insulation, floor tile, mastic, caulking, window glazing and boiler insulation, all mixed with building debris observed throughout all five floors and basement of the building.  An estimated 200 linear feet of pipe insulation and 280 square feet of boiler insulation were identified.  All asbestos was considered friable.

 

The bulk sampling strategy was based upon the protocol of homogenous areas established by the USEPA.  A homogeneous sampling area (HSA) is defined as an area of material that is uniform in color, texture, construction, general appearance, and date of installation.  Bulk samples of suspect ACM were analyzed by Polarized Light Microscopy (PLM) utilizing the EPA-600/M4-82-020 Method.  Bulk samples were analyzed using Asbestos Hazard Emergency Response Act (AHERA) “positive stop” protocol, meaning each sample of each HAS group is analyzed until asbestos is found in the HAS or all samples in the group are analyzed and are negative for asbestos content.

Fehr-Graham Engineering performed an investigation of the building to ascertain the existing conditions and to make recommendations for necessary shoring and stabilization to allow the asbestos to be mitigated. 

 

The collapsed floors along the west elevations have rendered the wall unsupported for its entire height.  Masonry walls rely upon the lateral bracing provided by the floor systems.  The bowing of the west wall observed from the exterior is consistent with unsupported masonry walls of this height.

 

The sagging floors immediately south of the collapsed bay require shoring along with areas of the fourth and fifth floors.  Repairs to all levels require access between floors, which is currently limited due to the poor condition of the stairs.  Further, any vibrations that are caused by stabilization work could be detrimental to the exterior masonry walls.

 

Fehr-Graham’s professional opinion concludes that without stabilization and re-roofing the building may suffer from a partial or full collapse.

 

USEPA also conducted an assessment of the building on January 28th, 2015, to provide a second opinion regarding the structural integrity of the building.  A structural engineer from USEPA START contractor Tetra Tech inspected the building and agrees with the Fehr-Graham conclusions.  Furthermore, additional damage was discovered on the exterior side of the west wall of the building during the site visit increasing concern that partial of complete structural failure of the building is imminent unless stabilization or controlled demolition measures are taken immediately.

 





2. Current Activities
  2.1 Operations Section
    2.1.1 Narrative

2.1.2 Response Actions to Date

08/21/2015 - Remove last section of wall in NE corner; minor damage to adjacent building; moved remaining debris in basement to loading area; 20 loads of ACM debris shipped; one load of scrap steel recycled.
08/24/2015- Continue loading ACM debris; 19 loads shipped; negotiated repair work with owner of adjacent building, owner will get estimate for work; Bank requesting rent for use of parking lot during removal action, EPA will agree to rent request and re-seal and re-stripe parking lot; removing protective material from adjacent roof.
08/25/2015 - Completed debris removal, shipped 20 loads of ACM debris; completed cleaning and washing adjacent roof; sweep and wash area around foundation.
08/26/2015 - Backfilling foundation with limestone screenings; general site cleanup.
08/27/2015 - Continue backfilling foundation; decon trailer demobed.
08/28/2015 - Continue backfilling foundation; prep equipment for demobe.
08/31/2015 - Backfilling and compaction completed; waiting on repair bid from adjacent building owner; prep equipment for demobe.
09/01/2015 - Crane and compactor demobed; RA Report sent in for completion; continue general cleanup.
09/02-04/2015 - RM and clerk on-site demobing remaining equipment.
09/08-10/2015 - RM on site to demobe site trailers and oversee sealcoating and stripping of parking lot; site fencing removed; ERRS working on payments to Bank for rent and adjacent owner for repair work.
 
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)

Current property owner was sent a General Notice Letter, financial resources were not available to conduct the removal work.
.
2.1.4 Progress Metrics

Waste Stream Medium Quantity Manifest # Treatment Disposal
 ACM Debris  solid  1530 tons      Laraway landfill, Joliet, Il
 Scrap Metal  solid 140 tons       Recyling thru subcontractor
           
Regional Metrics
This is an Integrated River Assessment. The numbers should overlap. Miles of river systems cleaned and/or restored  NA
Cubic yards of contaminated sediments removed and/or capped  NA
Gallons of oil/water recovered  NA
Acres of soil/sediment cleaned up in floodplains and riverbanks  NA
Stand Alone Assessment Number of contaminated residential yards cleaned up  NA
Number of workers on site  9
Contaminant(s) of Concern  Asbestos
Oil Response Tracking
Estimated volume Initial amount released  NA
Final amount collected  NA
CANAPS Info FPN Ceiling Amount  NA
FPN Number  NA
Body of Water affected  NA
Administrative and Logistical Factors (Place X where applicable)
 X Precedent-Setting HQ Consultations (e.g., fracking, asbestos) Community challenges or high involvement   Radiological
  More than one PRP   Endangered Species Act / Essential Fish Habitat issues   Explosives
  AOC   Historic preservation issues   Residential impacts
  UAO   NPL site   Relocation
  DOJ involved   Remote location   Drinking water impacted
  Criminal Investigation Division involved   Extreme weather or abnormal field season  X Environmental justice
  Tribal consultation or coordination or other issues   Congressional involvement  X High media interest
  Statutory Exemption for $2 Million   Statutory Exemption for 1 Year   Active fire present
 X Hazmat Entry Conducted – Level A, B or C   Incident or Unified Command established   Actual air release (not threatened)
           
Green Metrics
  Metric Amount   Units
  Diesel Fuel Used    300   gallons
  Unleaded Fuel Used    250   gallons
  Alternative/E-85 Fuel Used       gallons
  Electricity from electric company    NA   kWh
  Electric Company Name and Account #    NA    
  Electricity from sources other than the electric company    Generator   350 kWh
  Solid waste reused    Spent limestone screenings   2000 tons
  Solid waste recycled    Scrap Steel    140 tons
Water Used    60,000   gallons
Version 150825


  2.2 Planning Section
    2.2.1 Anticipated Activities

Submit payments to Bank and adjacent building owner.

2.2.1.1 Planned Response Activities

No additional response actions anticipated

2.2.1.2 Next Steps

None

2.2.2 Issues

Communication service was disrupted to an adjacent business due to line damage from demolition work.  ATT was requested to move the line prior to work start, but action was not completed.  New line is being located to the front of the building to restore service.  Minor damage to the adjacent building wall and roof, will negotiate repair work with owner.

  2.3 Logistics Section
    ERRS and Demolition company supplied all personnel and equipment.

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    2.5.1 Safety Officer

Demolition contractor had a certified asbestos manager on site, EPA was overall safety officer.

2.5.2 Liaison Officer

NA


2.5.3 Information Officer

Charles Rodriguez, EPA, is the Community Involvement Coordinator.
Site Fact Sheet was distributed to the adjacent businesses in the area.  Fact sheet was  posted on signs along the east and north perimeter fencing.

3. Participating Entities
  3.1 Unified Command

EPA

3.2 Cooperating Agencies

City of Ottawa
Illinois EPA

4. Personnel On Site
  EPA - 1
START - 1
ERRS - 2
American Demolition - 6
RiskNomics - 1

5. Definition of Terms
  EPA - Environmental Protection Agency
ERRS - Emergency & Rapid Response Services
HASP - Health and Safety Plan
mg/kg - milligrams per kilogram
OSC - On scene coordinator
ppb - parts per billion
ppm - parts per million
RM - removal manager
START - Superfund Technical Assessment & Response Team
TDD - Technical Direction Document
TO - Task Order
ACM - Asbestos Contaminated Material
f/cc - fibers per cubic centimeter
PEL - Permissible Exposure Level

6. Additional sources of information
  6.1 Internet location of additional information/report

www.epaosc.org/littlecitybuilding


6.2 Reporting Schedule

No additional reports anticipated

7. Situational Reference Materials
  No information available at this time.