U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Valley Drive Abandoned Slurry

Documents

All Documents [29]
Categories
<<  <  1 2  >  >> 
File Name Description Category Uploaded Size Download 
Fwd_ NRC1341537.pdf Original NRC Report Admin Record 9/8/2022 158 KB Download
Kalispell Valley Drive Tanks - Administrative Record MDEQ Files.pdf A set of documents provided to EPA by the MDEQ regarding their investigation and enforcement efforts at the Site Admin Record 9/8/2022 159647 KB Download
Kalispell_Peronard Declaration.pdf Declaration of the EPA OSC in support of the Warrant Application Admin Record 9/8/2022 1985 KB Download
Kalispell_Ex parte application.pdf The DOJ/EPA application for a warrant for access to the property Admin Record 9/8/2022 234 KB Download
Kalispell_Signed Warrant.pdf Signed Access Warrant provided by EPA/DOJ to the Court Admin Record 9/15/2022 275 KB Download
SIGNED - Valley Drive Abandoned Slurry AM.pdf Signed Action Memo which documents the decision to conduct a clean-up at the Site. Admin Record 9/27/2022 1984 KB Download
Valley Drive Abandoned Slurry Photolog.pdf Photolog of photos from the Initial Report and the first site visit Admin Record 9/9/2022 391 KB Download
Work Order_Ops Period 01.pdf ERRS Work Order Authorization for the Operational Period starting September 15, 2022. Operations 9/23/2022 252 KB Download
Final Valley Drive Abandoned Slurry Site SAP_09232022.pdf Sampling and Analysis Plan Data 9/26/2022 2542 KB Download
Weekly Site Update 20220926.pdf EPA Site Update provided to stakeholders on September 26, 2022. Site Update 9/26/2022 1154 KB Download
ERRS Report west valley period one summary.pdf An email from the ERRS Response Manager summarizing the work accomplished during the first operational period. Operations 9/26/2022 148 KB Download
Work Order ops period 2.pdf The work order issued by the EPA OSC outlining work planned for the second operational period. This covers the period of 9/26-10/01, 2022 Operations 9/26/2022 213 KB Download
final work plan.pdf This is the workplan provided by Environmental Restoration prior to Site Mobilization. It serves as an initial approach for accomplishing the work at the Site. Planning 9/26/2022 1892 KB Download
Removal Site Inspection Sample Summary Table_Unvalidated Data.pdf Summary Table of results for the Removal Site Inspection samples (Unvalidated Data). Data 10/6/2022 799 KB Download
Removal Site Inspection Sample Lab Results_THTPHPCBTALM_Unvalidated_0802022.pdf Lab Results (1 of 3) for the Removal Site Inspection Samples (Unvalidated Data). Waste sample collected on August 2, 2022 from right-a-way drainage ditch. Data 10/6/2022 26804 KB Download