File Name
Category
Uploaded
torch lake area assessment report.pdf
Final Report
report
1/3/2008
77876 KB
Download
fig1-overview.jpg
fig1-overview
map
9/18/2007
97 KB
Download
fig2a-quincy.jpg
fig2a-quincy
map
9/18/2007
1159 KB
Download
fig2b-quincy(results).jpg
fig2b-quincy(results)
map
9/18/2007
847 KB
Download
fig3a-dollarbay.jpg
fig3a-dollarbay
map
9/18/2007
1122 KB
Download
fig3b-dollarbay(results).jpg
fig3b-dollarbay(results)
map
9/18/2007
832 KB
Download
fig4a-mason.jpg
fig4a-mason
map
9/18/2007
1236 KB
Download
fig4b-mason(results).jpg
fig4b-mason(results)
map
9/18/2007
1124 KB
Download
fig5a-c&h.jpg
fig5a-C&H
map
9/18/2007
1058 KB
Download
fig5b-c&h(results).jpg
fig5b-c&h(results)
map
9/18/2007
868 KB
Download
fig6-tamarack&hubbell.jpg
fig6-tamarack&hubbell
map
9/18/2007
1002 KB
Download
fig7a-hubbell docks and smelter.jpg
fig7a-hubbell docks and smelter
map
9/18/2007
1060 KB
Download
fig7b-hubbell docks and smelter(results).jpg
fig7b-hubbell docks and smelter(results)
map
9/18/2007
1077 KB
Download
fig8a-c&h power and lake linden.jpg
and LakFig8a-C&H Power e Linden
map
9/18/2007
1130 KB
Download
fig8b-c&h power and lake linden(results).jpg
Fig8b-C&H Power and Lake Linden(results)
map
9/18/2007
1068 KB
Download
fig9a-backwater,traprock,bootjack.jpg
Fig9b-Backwater, Traprock, Bootjack
map
9/18/2007
1187 KB
Download
fig9b-backwater,traprock,bootjack(results).jpg
Fig9b-Backwater, Traprock, Bootjack(results)
map
9/18/2007
965 KB
Download
fig10a-gay.jpg
Fig10a-Gay
map
9/18/2007
1087 KB
Download
fig10b-gay(results).jpg
Fig10b-Gay(results)
map
9/18/2007
1070 KB
Download
fig10c-gay(results2).jpg
Fig10b-Gay(results2)
map
9/18/2007
817 KB
Download
western shore buildings.jpg
Initiate Assessment of Western Shore Buildings
map
9/12/2007
192 KB
Download
pictures of gay, michigan.ppt
Gay Stamp Sands
power point
9/12/2007
2698 KB
Download
torch lake draft scope of work.doc
Draft Scope of Work
report
9/12/2007
62 KB
Download
fig1-overview.jpg
Draft Scope of Work Fig 1
map
9/12/2007
97 KB
Download
fig2-gay.jpg
Draft Scope of Work Fig 2
map
9/12/2007
106 KB
Download
fig3-quincy.jpg
Draft Scope of Work Fig 3
map
9/12/2007
186 KB
Download
fig4-dollarbay.jpg
Draft Scope of Work Fig 4
map
9/12/2007
169 KB
Download
fig5-mason.jpg
Draft Scope of Work Fig 5
map
9/12/2007
170 KB
Download
fig6-c&h.jpg
Draft Scope of Work Fig 6
map
9/12/2007
147 KB
Download
fig7-tamarack&hubbell.jpg
Draft Scope of Work Fig 7
map
9/12/2007
143 KB
Download
fig8-hubbell docks and smelter.jpg
Draft Scope of Work Fig 8
map
9/12/2007
143 KB
Download
fig9-c&h power and lake linden.jpg
Draft Scope of Work Fig 9
map
9/12/2007
164 KB
Download
fig10-backwater,traprock,bootjack.jpg
Draft Scope of Work Fig 10
map
9/12/2007
176 KB
Download
u.s. epa memo on no action at the coal dock.pdf
Memo on No Action at the Coal Dock
document
9/13/2007
266 KB
Download
aoc1994-278200.pdf
1994 AOC
report
9/12/2007
2871 KB
Download