U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

BP Alaska GC1-GC2 Transmission Pipeline Discharge

Images

All Images [107]
Categories
<<  <  1 2 3 4 5  ...  >  >> 
Pipelines exposed from underneath the caribou crossing.<br />Date Taken: 3/27/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
GC2 Oil Transit Line Release spill area panorama, looking from west (left) to east (right).<br />Date Taken: 3/27/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Central portion of the GC2 Oil Transit Line spil area, viewed from the caribou crossing<br />Date Taken: 3/27/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Central portion of the GC2 Oil Transit Line spil area, viewed from the caribou crossing<br />Date Taken: 3/27/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Western portion of the GC2 Oil Transit Line spil area, viewed from the caribou crossing<br />Date Taken: 3/27/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Typical ice/tundra "hot spot" which appeared clean after initial trimming.  Oil in small amounts resurfaced 24 hours after trimming occurred.<br />Date Taken: 3/26/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
View of spill area looking north from the caribou crossing.  Trimming for gross oil contamination on the ice/tundra surface has occurred.<br />Date Taken: 3/26/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Frozen lake shoreline facing west, showing light to moderate surface contamination and oil within ice cracks/channels.<br />Date Taken: 3/26/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
A sweeper machine is being used in the contaminated tundra trimming operation to consolidate trimmings as well as conduct light trimming in areas of minimal oil contamination.<br />Date Taken: 3/20/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
A Bobcat machine with an 18" trimmer attachment performing contaminated ice and tundra trimming in a trench within the spill area.<br />Date Taken: 3/20/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Cleanup workers removing trimmings from an area the trimmer just passed through.<br />Date Taken: 3/19/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Cleanup workers removing trimmings from where the trimmer just passed through.<br />Date Taken: 3/19/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Delineation of a trimmed area with traffic cones.  The caribou crossing is in the background.<br />Date Taken: 3/19/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
An ice core sample being collected from a trimmed area to determine if oil contamination is still present.<br />Date Taken: 3/19/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
A sweeper machine, to be used for collecting ice trimmings, is prepared for use while in a staging area.  Support trailers are in the background.<br />Date Taken: 3/19/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
An ice melter unit awaiting installation at CC2A pad.<br />Date Taken: 3/19/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Contaminated ice and vegetation chips produced through trimming operations are transferred by workers into a loader bucket for eventual off-site transport.<br />Date Taken: 3/19/2005<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Chipped, contaminated ice and vegetation that was trimmed from the spill area is being transferred within the spill area from a small loader into a larger bucket for eventual loading into an off-site transport truck.<br />Date Taken: 3/19/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
The southern portion of the spill area following clearing of contaminated snow and prior to ice trimming.  A tent in the background covers the pipeline being excavated out from the elevated cairbou crossing.<br />Date Taken: 3/19/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
The western portion of the spill area following contaminated snow removal and prior to ice trimming.<br />Date Taken: 3/19/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags: