BP Alaska GC1-GC2 Transmission Pipeline Discharge

All POLREP's for this site BP Alaska GC1-GC2 Transmission Pipeline Discharge
Deadhorse, AK - EPA Region X
POLREP #17 - Final
Printer Friendly  |   PDF
 
On-Scene Coordinator - Carl Lautenberger 8/25/2006
Emergency - Removal Action Pollution Report (POLREP) #17
Start Date: 3/2/2006
Pollution Report (POLREP) #17
Site Description
As reported in previous POLREPs.

The photo at left shows the spill site tundra restoration effort progress as of Aug 22.

Current weather conditions: daytime highs are 40-50's F, mostly cloudy with dense fog, and east winds 10 to 15 mph.   North Slope temperatures are beginning to fall to or below freezing at night with summer conditions transitioning to fall / winter conditions again.  


Current Activities
All planned cleanup operations have been completed.  Backfilling the land areas trimmed of contaminated ice and tundra with replacement tundra and organic material was completed on April 29, 2006.  All cleanup confirmation samples collected during the residual oil trimming operation showed results below applicable State of Alaska cleanup standards. New tundra material was fertilized and watered during the summer months. BP's tundra restoration consultant reports that the project is off to a good start with a wide diversity of vegetation species being observed. Booms placed along the lake front and wildlife exclusion fences  are being removed prior to freeze up. No additional sheening has been observed / reported this summer since minor amounts were detected and removed during break-up.

The leaking pipeline has been repaired via a welded sleeve but is not back in service. BP continues to take actions to determine the integrity of the pipeline as per a Corrective Action Order issued by DOT Pipeline Safety & Hazardous Materials Administration, PSHMA. Due to discoveries this summer and a subsequent similar  spill in the Eastern Operating Area of BP's Prudhoe Bay field, the entire transit line will be replaced this winter.



Planned Removal Actions
All planned cleanup operations have been completed and final.

Next Steps
The site will undergo visual monitoring next year, May 07, as springtime break-up occurs and throughout the summer, with potential oil sheening, the integrity and re-growth of the back filled tundra, and wildlife access prevention being primary concerns.  

A cost documentation package will be submitted to the USCG NPFC for recovery of OSLTF dollars spent in the oversight of this response


Key Issues
The integrity of transit pipelines in the BP Prudhoe bay oilfield continues to be scrutinized by federal and state regulators. EPA will continue to coordinate with the involved parties to address prevention of future transit line spills.