U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Carter Color Coat Site

Images

All Images [33]
Categories
Disposal of totes and PCB ballasts<br />Date Taken: 1/5/2009<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
ERRS sweeping the fourth floor of the building<br />Date Taken: 12/10/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Sump found in truck ramp area<br />Date Taken: 11/21/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Removing debris and drums from truck ramp area<br />Date Taken: 11/18/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
sweeping dry solids on the fifth floor<br />Date Taken: 11/13/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Clean fourth floor<br />Date Taken: 11/7/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Pumping unknown liquid out of AST<br />Date Taken: 11/6/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Removing PCB-contaminated wood block floor from the fourth floor<br />Date Taken: 11/3/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Removing PCB-contaminated wood block from the fourth floor<br />Date Taken: 10/30/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Moving equipment from the fifth floor to the fourth floor<br />Date Taken: 10/29/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
cutting up AST<br />Date Taken: 10/28/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Fifth floor after removal<br />Date Taken: 10/24/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
PCB-contaminated wood block removal from fifth floor<br />Date Taken: 10/17/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Fifth floor before removal<br />Date Taken: 10/16/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Lifting equipment to fifth floor with crane<br />Date Taken: 10/16/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Cleared third floor.<br />Date Taken: 10/15/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Loading trucks for T&D<br />Date Taken: 10/10/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Third floor during removal of PCB-contaminated wood block<br />Date Taken: 10/9/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Wood block stockpile<br />Date Taken: 10/8/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Clean area of the third floor removal<br />Date Taken: 10/8/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Removing PCB-contaminated wood block from third floor<br />Date Taken: 10/7/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Moving skid steer onto the third floor<br />Date Taken: 10/7/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Completed second floor.<br />Date Taken: 10/6/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Moving skid steer to second floor<br />Date Taken: 10/1/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Lifting skid steer onto second floor<br />Date Taken: 10/1/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Setting up crane to move skid steer to the second floor<br />Date Taken: 10/1/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Stockpile of wood block flooring<br />Date Taken: 9/29/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Delivery of platform to move equipment onto the various floors of the building<br />Date Taken: 9/29/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Removing metal from inside building for skid steers<br />Date Taken: 9/29/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
First floor with wood block removed.<br />Date Taken: 9/25/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Removing wood block flooring on the first floor of the building<br />Date Taken: 9/24/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Wood Block Pyramid<br />Date Taken: 9/22/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Asbestos<br />Date Taken: 9/22/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags: