1. Introduction
|
|
1.1 Background
|
|
|
Site Number: |
IDN001002885 |
|
Contract Number: |
|
D.O. Number: |
|
|
Action Memo Date: |
9/30/2010 |
Response Authority: |
CERCLA |
|
Response Type: |
Emergency |
Response Lead: |
EPA |
|
Incident Category: |
Removal Action |
NPL Status: |
Non NPL |
|
Operable Unit: |
|
Mobilization Date: |
8/22/2011 |
|
Start Date: |
8/22/2011 |
Demob Date: |
10/25/2011 |
|
Completion Date: |
10/25/2011 |
CERCLIS ID: |
IDN001002885 |
|
RCRIS ID: |
|
ERNS No.: |
|
|
State Notification: |
09/30/2010 |
FPN#: |
|
|
Reimbursable Account #: |
|
1.1.1 Incident Category
Refer to initial POLREP.
1.1.2 Site Description
Refer to initial POLREP.
1.1.2.1 Location
Refer to initial POLREP.
1.1.2.2 Description of Threat
Refer to initial POLREP.
1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
Refer to initial POLREP.
|
2. Current Activities
|
|
2.1 Operations Section
|
|
|
2.1.1 Narrative
EPA mobilized to the Site on 22 August 2011 and started cleanup actions on those properties where cleanup was postponed during 2010 because of access, schedule, and winter conditions. EPA completed cleanup actions and demobilized from the Site on 25 October 2011
2.1.2 Response Actions to Date
Removed the interim gravel protective barriers placed at four locations during 2010 and excavated the underlying asbestos-contaminated fill materials and excavated the asbestos-contaminated fill materials found at another three locations. All excavated materials, except recovered ACP which was transported off-Site for disposal, were consolidated at a fourth location beneath a protective barrier, and the interim barrier placed on one property during 2010 was deemed final. In total, 21 properties were addressed by EPA during 2010 and 2011.
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
Ongoing.
2.1.4 Progress Metrics (2011)
Waste Stream |
Medium |
Quantity |
Manifest # |
Treatment |
Disposal |
Asbestos |
ACP/Soil |
1660 cubic yards |
|
|
On-site |
Asbestos |
ACP |
1.5 cubic yards
|
|
|
Off-Site
|
|
|
|
|
|
|
|
|
2.2 Planning Section
|
|
|
2.2.1 Anticipated Activities
N/A - the removal action is complete.
2.2.1.1 Planned Response Activities
N/A
2.2.1.2 Next Steps
N/A
2.2.2 Issues
N/A
|
|
2.3 Logistics Section
|
|
|
Sufficient personnel, equipment, and material were available to support cleanup activities.
|
|
2.4 Finance Section
|
|
|
No information available at this time.
|
|
2.5 Other Command Staff
|
|
|
2.5.1 Safety Officer
Refer to initial POLREP.
2.6 Liaison Officer
N/A
2.7 Information Officer
2.7.1 Public Information Officer
N/A
2.7.2 Community Involvement Coordinator
Refer to initial POLREP.
|
3. Participating Entities
|
|
3.1 Unified Command
N/A
3.2 Cooperating Agencies
Refer to initial POLREP.
|
4. Personnel On Site
|
|
1 - EPA; 1 - START; 11 - ERRS.
|
5. Definition of Terms
|
|
N/A
|
6. Additional sources of information
|
|
6.1 Internet location of additional information/report
N/A
6.2 Reporting Schedule
N/A
|
7. Situational Reference Materials
|
|
N/A
|