U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Bridger Pipeline Release

Documents

All Documents [45]
Categories
<<  <  1 2 3  >  >> 
File Name Description Category Uploaded Size Download 
PoplarPipelineResponse_OP_16_REV1.pdf Signed IAP for Extension of Operational Period 16 IAP 3/27/2015 3710 KB Download
Initial Phase III Shoreline Assessment Work Plan SIGNED.pdf Signed Shoreline Assessment Plan Signed Plan 3/20/2015 4582 KB Download
PoplarPipelineResponse_OP16_SIGNED.pdf Signed IAP for Operational Period 16 IAP 3/20/2015 3562 KB Download
PoplarPipelineResponse_Reclamation_Plan_Signed 4.pdf Poplar Pipeline Response Signed Reclamation Plan Signed Plan 2/27/2015 2743 KB Download
PoplarPipelineResponse_Reclamation_Plan_Signed 3.pdf Poplar Pipeline Response Signed Reclamation Plan Signed Plan 2/27/2015 2742 KB Download
PoplarPipelineResponse_Reclamation_Plan_Signed 2.pdf Poplar Pipeline Response Signed Reclamation Plan Signed Plan 2/27/2015 2767 KB Download
PoplarPipelineResponse_OP15_Signed.pdf Signed IAP for Operational Period 15 IAP 2/26/2015 1509 KB Download
WTP Analytical Summary 02-24-15.pdf Analytical data summary from Glendive Water Treatment Plant Data 2/24/2015 39 KB Download
PoplarPipelineResponse_OP14_Signed.pdf Signed IAP for Operational Period 14 IAP 2/19/2015 1676 KB Download
PoplarPipelineResponse_OP13_Signed.pdf Signed IAP for Operational Period 13 IAP 2/12/2015 2119 KB Download
PoplarPipelineResponse_Well_Task_Plan_v1.1_signed.pdf Poplar Pipeline Response Ground Water Well Sampling Plan v1.1 Signed Plan 2/6/2015 1120 KB Download
PoplarPipelineResponse_OP12_signed.pdf Signed IAP for Operational Period 12 IAP 2/5/2015 1546 KB Download
Hydrant Analytical Summary.pdf Summary of Glendive fire hydrant flush analytical data Data 2/4/2015 36 KB Download
PoplarPipelineResponse_PhaseII_&_PhaseIII_v1.0_signed_public_reduced.pdf Phase II and Phase III Response Plan v1.0 Signed Plan 1/30/2015 13844 KB Download
PoplarPipelineResponse_PhaseII_&_PhaseIII_v1.0_signed.pdf Phase II and Phase III Response Plan v1.0 (Not for Public Distribution
Sensitive Wildlife and Cultural Information)
Signed Plan 1/29/2015 22754 KB Download