File Name
Category
Uploaded
01_Argonaut Mine Dam - Main Report 2.pdf
Argonaut Mine Dam - Phase II Technical Report, Stability and Retrofit Alternatives Investigation, prepared by USACE, dated 11-14-2015.
USACE Dam Reports
12/9/2016
3297 KB
Download
Heavy Rainfall Inspection Report_011315_QC1.pdf
Heavy Rainfall Inspection Report including observations of cracks in buttresses and survey results prepared by the USACE.
USACE Dam Reports
12/9/2016
8364 KB
Download
Argonaut Dam Survey Report 11-19-2015.pdf
Eastwood Multiple Arch Dam Baseline Survey Report prepared by USACE
USACE Dam Reports
12/15/2015
8734 KB
Download
DTSC Letter to Amador County on Dam Safety_Sep2010.pdf
Department of Toxic Substances Control Letter to Amador County Regarding Argonaut Mine Tailings Dam Safety, Jackson, California dated September 30, 2010.
Dam Failure Study
9/18/2015
4423 KB
Download
Argonaut-DSOD-1933.pdf
Argonaut Mine Tailings Dam DTSC Letter, dated September 30, 2010.
Dam Failure Study
9/18/2015
6571 KB
Download
USSD_2015_Retrofit Alternatives.pdf
New Innovative Techniques for Strengthening Old Buttress Dams and Multiple Arch Dams
USACE Dam Reports
9/18/2015
1034 KB
Download
State Design Estimate 090715.xlsx
Argonaut Mine Site Structural Retrofit Design
USACE Dam Reports
9/18/2015
13 KB
Download
Argonaut Mine 8-15_Final to Print.pdf
Fact Sheet for Community Meeting on August 18, 2015 and Upcoming EPA Activities
Fact Sheet
8/10/2015
2534 KB
Download
Argonaut Mine Site Inspection Report.pdf
Site Inspection Report, Argonaut Mine, prepared by Weston Solutions, dated July 2015
Site Inspection Rpt
7/29/2015
6972 KB
Download
Signed Action memo_July2 2015.pdf
Action Memo for Change in Scope and Cost Increase date July 2, 2015. This document describes the proposed actions to remove contaminated soils from residential properties and cap the slopes of an embankment at Jackson Junior High School
Action Memo
7/20/2015
692 KB
Download
Dam Failure Study Executive Summary_060915_Final.docx
Executive Summary for Argonaut Dam Failure Study, prepared by Dan Shane, On-Scene Coordinator, USEPA, June 9, 2015
Dam Failure Study
6/11/2015
38 KB
Download
Flow Modeling and Damage Estimates for the Argonaut Mine Dam Failure Study.pdf
Flow Modeling and Damage Estimates for Argonaut Mine Dam Failure Study, prepared by RTI and CDM Smith for EPA Office of Research & Development, Engineering Technical Support Center, June 9, 2015
Dam Failure Study
6/9/2015
14293 KB
Download
FINAL GEOTECHNICAL REPORT_FEB2015_USACE.pdf
Final Geotechnical Report Prepared by U.S. Army Corps of Engineers dated February 2015.
Dam Failure Study
6/3/2015
9508 KB
Download
FINAL_AD_STAB_EVAL_AND_RETRO_060315_QC_USACE.pdf
Dam Stability Evaluation Report Phase 1 Report Prepared by U.S. Army Corps of Engineers dated January 6, 2015
Dam Failure Study
6/3/2015
1287 KB
Download
Fig-1 Argonaut Geotech Borings.pdf
START contractor's geotechnical borings location map
START Dam Reports
5/14/2015
266 KB
Download